Trust · what we got wrong

Corrections

We fix mistakes in the open. This log lists every substantive correction to numbers, labels or claims on the site: what was wrong, what it says now, and the date. Pre-launch fixes from our own scrutiny reviews (3 October 2026) are included. To report an error, contact the StackPath team with the page and the source.

Updated 10 October 2026 · data build 2026-10-10 · how we know · corrections

Correction log

DateWhat was wrongWhat it says now
2026-10-03Grid capacity for data centres given as 1,300 MVA connected or contracted and 1,600 MVA applied for, figures from EirGrid's July 2020 paper.About 2,400 MVA contracted (EirGrid AIRAA 2026–35: ~2,100 transmission + ~300 distribution) and about 5.8 GW of possible new demand (system operators' market sounding, cited in CRU2025236).
2026-10-03Renewables gap for new data-centre demand given as 5.55 TWh a year (about 2.1 GW of wind), mixing CSO metered data with EirGrid forecasts.Recomputed on one basis (EirGrid 9.4 → 14.6 TWh): 4.16 TWh a year, about 1.6 GW of onshore wind.
2026-10-03On-site combustion plant described in GW and as 'fossil'.Shown as megawatts of thermal input (MWth/GWth), labelled combustion plant, with HVO noted.
2026-10-03Amazon described as using about 49% of Irish data-centre electricity, with no caveat.Up to about 49%, an upper bound from two sources (EPA reports against CSO); roughly 40–50%. Amazon's licensed sites reported about 3.7 TWh in 2025.
2026-10-03Hero tile counted 16 EPA licences (an older list including withdrawn and rejected licences), contradicting the Power tab.Counts licences held or sought from the current EPA dataset.
2026-10-03Energia's 150 MW Huntstown project described as Microsoft's; the reason for refusing an Equinix appeal attributed to the Board.Applicant named as Huntstown Power Co. (Energia), with Microsoft as the renewables buyer; refusal reasons given as recorded in the case files.
2026-10-03Inspector-report note said five reports gave no power figure.13 of 22, computed from the data.
2026-10-03Europe comparison said wind was flat at about 38% since 2020 and gas 'filled the gap'.Computed from the trend: wind ranged 31–38%, gas's share fell, and only net imports grew.
2026-10-03Build-time finding hard-coded as about 2 years (five cases) and a hard-coded price ratio.Computed from the data, with the sample size shown.
2026-10-03The state's RESS auction presented as the renewables data centres must match.Retitled and explained: state-supported projects can't count towards a data centre's 80%.
2026-10-03Capex section called five companies Ireland's 'five largest' operators, including Oracle.Named as five US hyperscalers.
2026-10-03Source line under the grid-capacity chart still cited a law-firm summary as 'second-hand'.Cites EirGrid AIRAA and CRU2025236, and says the two figures aren't like for like.
2026-10-03Gas contracts shown in MW; the interruptible-gas table printed raw 'true', 'false' and 'null'.MWth and GWth (maximum hourly load); labels Firm or exempt, Uncertain, Likely interruptible.
2026-10-03Investment callout said Irish data-hall construction 'stayed flat', contradicting its own tile.Says it fell, with the numbers computed from the data; tile relabelled as hyperscaler floor area.
2026-10-03Siting note implied Dublin flood risk had been checked against OPW maps.States that flood risk is unchecked for almost every candidate site.
2026-10-03Operator page for Amazon counted two Northern Ireland power deals as 'in Ireland'.Northern Ireland deals excluded; share caveated as an upper bound on operator and campus pages.
2026-10-03Press-review text said ~36% of contracted capacity is used.About 38–46%, allowing for power factor and the two capacity bases.
2026-10-03The CRU's interruptible-gas consultation described as 'doubling' a gas deficit.Two scenarios: +10% headroom to a 9% deficit by 2033 (best estimate), or +3% to an 18% deficit (risk-adjusted).