Open data and sources

Every dataset behind this site, how to cite it, and what isn't public.

Open data

Everything on this site as files you can use, with how to cite it.

DatasetRowsWhat's in itDownload
Data-centre campuses79one row per campus, joined across sourcesCSV
Planning applications156every application mentioning a data centreCSV
EPA generator licences29plant, role, permitted hours, annual reportsCSV
Appeals and inspector findings2222 inspector reports read case by caseCSV
Policy timeline4444 decisions with verified quotesCSV
Build lifecycle156application → decision → start → completionCSV
Corporate PPAs19announced deals with sourcesCSV
Valuation / rates66properties coded data centreCSV
Everythingthe full dataset behind this pageJSON
Cite as: StackPath, "Ireland data-centre power", data built 2026-10-10. Each dataset keeps its original licence (OpenStreetMap ODbL; Tailte Éireann, Ember and Oireachtas CC-BY-4.0; EPA, CSO, EirGrid public data).

Sources

What's pulled, what's summarised, and what isn't public.

DataFromStatus
Planning applications (all 31 councils)planningregister.ie / PlanSightpulled
EPA industrial emissions licencesEPA LEAP, via PlanSightpulled
Data-centre electricity use, quarterlyCSO MEC02pulled
RESS 5 renewable auction winnersEirGridpulled
Capacity auction T-4 2029/30SEMO / EirGridpulled
CRU data-centre connection rulesCRU decision, Dec 2025summarised
Grid demand totals and forecastEirGrid AIRAA 2026–2035 and CRU2025236summarised
Data-centre buildings on the maphttps://www.openstreetmap.org (© OpenStreetMap contributors, ODbL) via Overpass APIpulled
US hyperscaler capexSEC EDGAR XBRL company facts API (data.sec.gov/api/xbrl/companyfacts)pulled
What big users pay for electricityEurostat nrg_pc_205 (electricity prices for non-household consumers, bi-annual) - https://…pulled
Ireland's power vs EuropeEmber, Yearly electricity data - https://ember-energy.org/data/yearly-electricity-data/pulled
What data centres pay councilshttps://tailte.ie/home/api/; https://opendata.tailte.ie/api/Property/GetProperties?Fields=…pulled
What people askGoogle autocomplete (gl=ie, hl=en); Wikimedia pageviews REST APIpulled
Data centres in the OireachtasHouses of the Oireachtas Open Data API, https://api.oireachtas.ie/v1/questions and /v1/deb…pulled
What the planning inspectors foundAn Coimisiún Pleanála inspector reports (pleanala.ie), case list from planning register mi…pulled
Generators behind the data centresEPA LEAP Industrial Emissions licences (class 2.1 combustion >= 50 MWth): https://leap.epa…pulled
Ireland's grid, every 15 minutesEirGrid Smart Grid Dashboard, https://www.smartgriddashboard.com (JSON route https://www.s…pulled
Where the next one could goZoning: DHLGH Generalised Zoning Types (https://services.arcgis.com/NzlPQPKn5QF9v2US/arcgi…pulled
From permission to power-onCouncil planning registers via PlanSight mirror (local, read-only); plansight-2026-10-10.j…pulled
Every data centre in IrelandJoined from this project's pipelines: OpenStreetMap (osm_datacentres), EPA LEAP licences +…pulled
What it does to emissionsGovernment of Ireland, Sectoral Emissions Ceilings, September 2022; EPA, Ireland's Provisi…pulled
How policy got herePrimary documents from gov.ie/enterprise.gov.ie (DETE), CRU, EirGrid, DECC, local authorit…pulled
Who can supply the renewablesPlanSight planning database (council registers + An Coimisiun Pleanala); EirGrid RESS 1-5 …pulled
Who holds the grid capacityAn Coimisiún Pleanála inspector reports (pleanala.ie); EPA LEAP licence documents (leap.ep…pulled
Top sites, checkedZoning: DHLGH Generalised Zoning Types (https://services.arcgis.com/NzlPQPKn5QF9v2US/arcgi…pulled
How much lands in IrelandBuilding Control Management System commencement notices (NBCO national CSV via local PlanS…pulled
How much water they useEPA LEAP Annual Environmental Reports (Table 5 'Water Used'); Oireachtas PQ answers on dat…pulled
What's been reportedHand-compiled review of journalism, academic, NGO, industry and official publications on I…pulled
Gas: the next limitCRU202657 (25 Jun 2026); GNI NDP 2024 and 2023; GNI Winter Outlook 2025/26; Dáil PQ 33, 6 …pulled
How big is a data centre, really?Curated constants: CRU, CSO, SEAI, Uisce Éireann, Google, Epoch AI, IEA, NVIDIA, Uptime In…pulled
Offshore wind: Ireland's North SeaEirGrid ORESS 1 Final Auction Results (14 Jun 2023); ORESS 1 T&Cs (Nov 2022, v1.3 27 Mar 2…pulled
Your council and data centresJoins extra.directory, extra.valuation, extra.water and applications from ireland.json; Oi…pulled
How Ireland makes its electricityEmber monthly electricity data (https://ember-energy.org/data/monthly-electricity-data/, C…pulled
Data centres hiding in the planning registerPlanSight mirror of the Irish planning register (planningregister.ie), all councils; OpenS…pulled
Hardware arriving in IrelandEurostat Comext DS-045409 (EU trade since 1988 by HS2-4-6 and CN8), monthly, reporter IE: …pulled
What changedDated snapshots of EPA LEAP, An Coimisiún Pleanála case pages, CRU publications API and Ei…pulled
What to watchOfficial timetables (EirGrid RESS 6, SEMO capacity auction), ACP case pages (change feed, …pulled
From orbitCopernicus Sentinel-2 L2A via Element84 Earth Search STAC (https://earth-search.aws.elemen…pulled
Who's behind the companiesCurated from public registers: PlanSight planning mirror (planningregister.ie), council eP…pulled
Europe's AI build-out and Ireland's place in itEuroHPC JU selection releases (Dec 2024, Mar 2025, Oct 2025) and AI Gigafactories call (Ju…pulled
Ireland's risk registerComputed from this project's pipelines (generation, legacy_capacity, gas, emissions, euros…pulled
Ireland 2026–2032: scenariosModel built on this index's checked data (CSO MEC02, Ember, EirGrid AIRAA 2026-35, CRU/202…pulled
Facility specificationsAn Coimisiún Pleanála inspector reports and orders (pleanala.ie); EPA LEAP licence documen…pulled
The grid's limits on big loadshttps://www.sem-o.com/sites/semo/files/2026-10/Wk42_2026_Weekly_Operational_Constraints_Up…pulled
Critical-infrastructure law and data centresirishstatutebook.ie (S.I. 559/2024, S.I. 347/2026, S.I. 387-395/2026) · Oireachtas (Critic…pulled
Wholesale electricity pricesSEMOpx day-ahead market results (https://www.semopx.com/market-data/); Ember European whol…pulled
InterconnectorsEirGrid, CRU, EIB, AIRAA 2026-2035, promoters and press (quotes checked against cached tex…pulled
Import dependenceEirGrid Smart Grid Dashboard 15-minute ROI data (https://www.smartgriddashboard.com); CSO …pulled
Where there is grid headroomESB Networks, Network capacity heatmap, Customer heatmap download (2026-07) https://www.es…pulled
Who says whatHouses of the Oireachtas debates XML (data.oireachtas.ie); CRU consultation CRU/2025/04 re…pulled
Budget 2027: what it means for data centres and powerGovernment of Ireland Budget 2027 documents (gov.ie / assets.gov.ie)pulled
AI data centres and Ireland's fleetCurated: NVIDIA datasheets and engineering blogs, Uptime Institute, IEA, Epoch AI, NERC, M…pulled
Data centres and construction labourCSO (BEA04, BEA05, QLF03, EHQ03, NDQ01); DHLGH commencements; NBCO BCMS commencement notic…pulled
The firm-power gap, campus by campusStackPath gap table (issue 01): planning, ACP, EPA and capacity-market documents, page-cpulled
Earlier RESS rounds (1–4)EirGridnot yet
Named grid connection queueNot publishednot public
Corporate PPA pricesNot publishednot public