Data centre · Fingal · 53.4204, -6.3602

← All data centres

EdgeConneX Ballycoolin

permitted EdgeConneX Our classification · status

Not available for this site: measured grid draw (no EPA annual report: only sites with ≥50 MWth of plant file one); mapped footprint; rates (no valuation-list entry matched).

Why we say it's permitted

  • Planning FW22A/0257: unstarted, permission live
  • Planning FW21A/0222: unstarted (live permission, no commencement notice) (expires 2027-04-12)
  • Planning FW21A/0077: unstarted (live permission, no commencement notice) (expires 2026-10-28)

Who runs it

  • planning applicant 'EdgeConneX Ballycoolin I Limited' -> EdgeConneX (operator SPV; high-confidence entity link from CRO, planning)
  • some planning records joined by their planning history (cross-referenced refs, same site) and name no operator themselves
Leaflet © OpenStreetMap contributors

Planning history

ReceivedRefWhatDecisionBuilt?
2022-11-02FW22A/0257
Modification of approved plans (reg. refs. FW21A/0077 and FW21A/0222) for the change of use of the revised warehouse/logistics building, including 2 storey ancillary office accommodation (in reg. ref. FW21A/0222) to an energy centre containing 12 generators with flues to power 2 data storage buildings. High acoustic louvre screen surround comprising a radiator farm with 12 radiators, 2 black start emergency generators and associated site works.
GRANT PERMISSIONunstarted, permission live
Appeal 315599 (FW22A/0257) · no decision recorded

Sources for this page

planning:FINGAL/FW22A/0257 · planning:FINGAL/FW21A/0222 · planning:FINGAL/FW21A/0077 · acp:315599

Joined from OpenStreetMap, the planning register, An Coimisiún Pleanála, EPA licences and annual reports, the Tailte Éireann valuation list and Building Control. Data built 2026-10-10.