Data centre · South Dublin · 53.3202, -6.4665

← All data centres

Data & Power Hub Peamount, Newcastle

under construction Data & Power Hub Our classification · status

110 MWe
Stated maximum demand
planning documents · a ceiling, not use
557 MWth
On-site generation licensed
gas-peaker

Not available for this site: measured grid draw (no EPA annual report: only sites with ≥50 MWth of plant file one); mapped footprint; rates (no valuation-list entry matched).

Why we say it's under construction

  • Planning SD20A/0324: commencement notice 2025-09-10, no completion certificate

What's next on this site

  • permitted: EPA P1165: generators licensed, activity not commenced
  • permitted: Planning SD20A/0324/EP: commenced (no completion certificate on a main building yet)

Who runs it

  • EPA licensee 'Data And Power Hub Services Limited' -> Data & Power Hub (operator SPV; high-confidence entity link from CRO, EPA)
  • planning applicant
Leaflet © OpenStreetMap contributors

Generators and power

EPA licenceStatusRoleMWthPlantPermitted hours
P1165Licensed · Not Commencedgas-peaker5577 x 38.488 MWth dual-fuel gas engines (269 MWth, 116 MWe peaking plant) + 36 x 8 MWth HVO standby generatorsPeaking plant, applicant expects c. 2,500 h/yr; standby generators <500 h/yr

What the planning and licence documents say

P1165-01 installation (DUB40): 116 MWe gas-engine peaking plant with BESS exporting to grid, plus 2 ICT buildings (75 MW IT) with 36 HVO standby gens and a new 110 kV substation; PD Dec 2024.

SpecValueQuote and source
IT load75 MW"The proposed ICT facility will have an overall IT load of approx. 75MW IT when completed" EPA P1165-01: Letter from Applicant - Attachment-1-2-Non-Technical Summary-v3, p.11
Electrical demand110 MWe"a gross footprint of ~ 30,000 m2. It will require about ~110 MWe." EPA P1165-01: Oral Hearing Recommendation Memo 1, p.6
data centre buildings
Grid voltage110 kV"The 110 kV substation is to be connected to the national grid via two new underground single circuit 110 kV transmission lines" EPA P1165-01: Letter from Applicant - Attachment-1-2-Non-Technical Summary-v3, p.11
Connection pointnew on-site Peamount 110 kV GIS substation, looped into Castlebaggot-Kilmahud 110 kV circuit"routing to the existing 110kV Castlebaggot / Kilmahud circuit (approx. 940 m to the east of the site)" EPA P1165-01: Letter from Applicant - Attachment-1-2-Non-Technical Summary-v3, p.11
On-site generationgas engines as grid peaking plant (not powering DC) + backup HVO generators for ICT"are not power connected and nor are they reliant on each other. There are no direct power connections between each." EPA P1165-01: Inspectors Report-LA007312, p.5
Generating units43 units"Figures for the entire installation (7 no. engines and 36 no. generators) are:" EPA P1165-01: Inspectors Report-LA007312, p.4
7 dual-fuel gas engines + 36 standby HVO generators
On-site output116 MWe"Maximum generation capacity: 116 MWe" EPA P1165-01: Inspectors Report-LA007312, p.3
gas engines only (peaking plant)
On-site thermal input557 MWth"Total rated thermal input: 557 MWth" EPA P1165-01: Inspectors Report-LA007312, p.4
269 MWth engines + 288 MWth standby generators
Fuelnatural gas (HVO secondary); HVO for standby generators"In the event of an interruption to the natural gas supply, the engines will be capable of running on HVO" EPA P1165-01: Inspectors Report-LA007312, p.3
Running hoursengines ~2,500 h/yr peaking; standby <500 h/yr"the applicant has stated that this is expected to be around 2,500 hours per annum" EPA P1165-01: Inspectors Report-LA007312, p.8
HVO in engines <72 h/yr per RD
Coolingair cooling, evaporative mode in hot summer months"Outside of such periods, the ICT facility is served by air cooling." EPA P1165-01: Letter from Applicant - Attachment-1-2-Non-Technical Summary-v3, p.16
Water11.4 m3/day (derived)"Water 4,173 m3" EPA P1165-01: Inspectors Report-LA007312, p.27
derived: 4,173 m3/yr / 365
Phasing3 projects: power plant (SD20A/0058), ICT 2 buildings (SD20A/0324), substation (ABP 309773-21)"The installation is comprised of three projects, each subject to separate planning applications" EPA P1165-01: Inspectors Report-LA007312, p.4
DatesPD Dec 2024; objection TC report Jul 2025; GHG projected for 2027"PD issued: 12 December 2024" EPA P1165-01: Technical Committee Report P1165-01 V2 2, p.1
Heat reuseheat network judged not feasible for peaking plant"it would not be feasible to install a heat network" EPA P1165-01: Inspectors Report-LA007312, p.5
RenewablesRD requires decarbonisation feasibility study (solar, biofuels)"carry out a feasibility study on how to decarbonise the activity by identifying opportunities to increase the use of solar" EPA P1165-01: Inspectors Report-LA007312, p.28

Every value is quoted from the document and page cited; the quote was checked against that page's text. "Derived" means the reader worked it out from stated figures (shown in the quote). Planning and licence figures are design or permitted values, not measured use; values derived from an EPA annual environmental report (AER), mostly water, are reported use for that year. The note under each quote gives the scope and whether a demand figure is a maximum or an average.

Planning history

ReceivedRefWhatDecisionBuilt?
2026-04-15SD20A/0324/EP
Demolition of existing two storey dwelling of 'Bulmer' and associated outbuildings and demolition of the existing single storey house of 'Little Acre' and its associated garage and other buildings; demolition of single storey stable building on the overall site; construction of 2 two storey Information Communication Technology (ICT) facilities each with three storey plant levels and associated ancillary development which will have a gross floor area of 30,518sq.m on an overall site of 8.2 hectares; 1 two storey ICT facility (building A) will be located to the south-east of the site and will ha
Grant Extension of Duration of Permissioncommenced (no completion certificate on a main building yet)
2021-05-19SD20A/0324
Demolition of existing two storey dwelling of 'Bulmer' and associated outbuildings and demolition of the existing single storey house of 'Little Acre' and its associated garage and other buildings; demolition of single storey stable building on the overall site; construction of 2 two storey Information Communication Technology (ICT) facilities each with three storey plant levels and associated ancillary development which will have a gross floor area of 30,518sq.m on an overall site of 8.2 hectares; 1 two storey ICT facility (building A) will be located to the south-east of the site and will ha
Grant Permissioncommenced (no completion certificate on a main building yet)

Sources for this page

epa:P1165 · planning:SDCC/SD20A/0324 · planning:SDCC/SD20A/0324/EP

Joined from OpenStreetMap, the planning register, An Coimisiún Pleanála, EPA licences and annual reports, the Tailte Éireann valuation list and Building Control. Data built 2026-10-10.