Data centres in South Dublin

18
Operating campuses
22 known at any stage
322 MW
Average grid draw, 2025
41% of the total measured at EPA-licensed sites
€43m
Estimated rates a year
59% of national
30 ML
Metered water, 2025
EPA-licensed sites
78
Planning applications
67 granted · 7 refused · 18 appealed

Grid headroom in South Dublin

19 MVA
Demand headroom at HV stations, summed
24 transformer groups · upper bound
21 of 24
HV transformer groups with none
3 green · 0 capped by parent
0 MVA
At 38 kV
3 transformer groups
88%
Of LV substations with none
1,751 substations

Largest HV transformer groups, then MV, by demand headroom

StationConnect atDemand MVAGeneration MW
● Grange Castle38 kV062.1
● Cookstown38 kV067.6
● Kilteel38 kV05.1
● CookstownMV (10/20 kV)13.928.6
● TempleogueMV (10/20 kV)4.59.5
● KimmageMV (10/20 kV)0.911.3
● Grange Castle T101/T102MV (10/20 kV)033.1

headroomcapped by parentnone · size = demand MVA

ESB Networks' indicative transformer headroom, not a connection offer; it ignores upstream circuits and the transmission system. Station capacity Oct 2025, contracts to Aug–Oct 2025, compiled 12/12/2025. How to read it.

Local TDs asking about data centres

Eoin Ó Broin · Sinn Féin · Dublin Mid-West60
Paul Murphy · People Before Profit-Solidarity · Dublin South-West28
Bríd Smith · People Before Profit-Solidarity · Dublin South-Central17
Ciarán Ahern · Labour Party · Dublin South-West14
Mark Ward · Sinn Féin · Dublin Mid-West3
Gino Kenny · People Before Profit-Solidarity · Dublin Mid-West1
John Curran · Fianna Fáil · Dublin Mid-West1
John Lahart · Fianna Fáil · Dublin South-West1

Constituency-to-council matching is by name and approximate.

In the council chamber