Data centre · Wicklow · 52.8115, -6.1797

← All data centres

Echelon Arklow

under construction Echelon Our classification · status

50 MVA
Stated import capacity
planning documents · a ceiling, not use
456 MWth
On-site generation licensed
backup-diesel
2.6 ha
Building footprint mapped
2 buildings · OSM

Not available for this site: measured grid draw (no EPA annual report: only sites with ≥50 MWth of plant file one); rates (no valuation-list entry matched).

Why we say it's under construction

  • 2 building(s) mapped in OSM but no completion certificate, EPA commencement or valuation entry yet

What's next on this site

  • permitted: Planning 211080: unstarted, permission live
  • permitted: Planning 2372: unstarted, permission live (expires 2028-07-24)
  • permitted: Planning 2560594: unstarted, permission live (expires 2031-06-01)
  • permitted: Planning 2560806: unstarted, permission live (expires 2031-01-12)
  • permitted: Planning 23843: unstarted (live permission, no commencement notice) (expires 2029-04-29)
  • proposed: EPA P1240: licence applied for

Who runs it

  • EPA licensee 'Crag Arklow Limited' -> Echelon (operator SPV; high-confidence entity link from CRO, EPA, planning)
  • EPA licensee 'Crag Digital Avoca Limited' -> Echelon (operator SPV; high-confidence entity link from CRO, EPA, planning, press)
  • OSM name 'Echelon Data Centres'
  • planning applicant 'Crag Arklow Limited' -> Echelon (operator SPV; high-confidence entity link from CRO, EPA, planning); lifecycle: inferred, as 18914
Leaflet © OpenStreetMap contributors

Generators and power

EPA licenceStatusRoleMWthPlantPermitted hours
P1240Applied · backup-diesel45660 x 7.6 MWth emergency diesel/HVO generators<500 h/yr (applicant expects 24-48 h/yr)
P1202Withdrawn · primary-gas580.6530 x 19.355 MWth natural-gas engines (energy centre for the Avoca data-centre campus)—

What the planning and licence documents say

Multi-plot campus: generation/cooling figures are for DUB20 (P1240 IE application 2026, 3 ICT buildings, 60 backup gens); grid figures from the 2019 ABP 303938 permission; GFA from 25/60594 ICT facilities; separate gas-turbine energy centre (21/1080, 23/843) permitted but its licence (P1202) withdrawn.

SpecValueQuote and source
Import capacity50 MVA"the Maximum Import Capacity for the proposal is 50 MVA" ACP 303938 inspector report, p.37
2019 3-building data storage facility (ABP 303938); EirGrid indicated 270-540 MVA additional capacity
Grid voltage110 kV"upgrade of the 110 kilovolt (kV) substation to provide a substation compound comprising Gas Insulated Switchgear" ACP 303938 inspector report, p.4
Connection pointupgraded existing 110 kV substation to GIS with 4 x 50 MVA bays"Gas Insulated Switchgear (GIS equipment) (600sqm GFA) with 4 no. 50 Mega-Volt Amp bays" ACP 303938 inspector report, p.4
2019 permission; 23/843 later relocated Energy Centre 1 onto the previously permitted GIS compound
On-site generationbackup diesel/HVO generators (DUB20); separate gas-turbine energy centre permitted"In order to ensure a continuous supply of electricity to the ICT facility, emergency/back-up diesel generators will be installed." EPA P1240-01: Attachment-1-2-Non-Technical-Summary_7.pdf, p.10
energy centre per 23/843: 8 gas turbines + 4 black-start gens; earlier P1202 plan of 30 x 19.355 MWth gas engines withdrawn Jan 2025
Generating units60 units"The ICT facility will be supported by a total of 60 no. emergency diesel generators (each with a maximum rated thermal input of 7.6MWth)" EPA P1240-01: Attachment-1-2-Non-Technical-Summary_7.pdf, p.6
DUB20 backup only
On-site thermal input456 MWth (derived)"a total of 60 no. emergency diesel generators (each with a maximum rated thermal input of 7.6MWth)" EPA P1240-01: Attachment-1-2-Non-Technical-Summary_7.pdf, p.6
derived: 60 x 7.6 MWth; DUB20 backup only
Fueldiesel or HVO"The emergency generators will be operated using either diesel or Hydrotreated Vegetable Oil (HVO)." EPA P1240-01: Attachment-1-2-Non-Technical-Summary_7.pdf, p.11
Running hours<500 h/yr; expected 24-48 h/yr"in any given year the standby generators may operate for 24-48 hours in total, if at all" EPA P1240-01: Attachment-1-2-Non-Technical-Summary_7.pdf, p.13
Coolingair cooling, evaporative mode in hot summer months"required to operate in evaporative mode. Outside of such periods, the ICT facility is served by air cooling." EPA P1240-01: Attachment-1-2-Non-Technical-Summary_7.pdf, p.13
Floor area45,511 m2 (derived)"1 no. ICT facility building with a gross floor area (GFA) of c. 36,655 sq.m" WicklowCC ePlan register entry 2560594 (development description), p.1
derived: 36,655 + 2 x 4,428 (same description: '2 no. ICT facilities each with a GFA of c. 4,428 sq.m'); 25/60594 (granted Apr 2026) only; 2019 ABP 303938 scheme was 41,160 m2, DUB20 (23/72) not in listed docs
PhasingDUB20 3 ICT buildings; Energy Centre 1 relocated, Energy Centre 2 later; further 3 ICT facilities (25/60594)"A licence application for a separate Energy Centre 2, to be constructed at a later date, will also be required" EPA P1202-01: Withdrawal Recommendation - P1202-01 1, p.2
DatesDUB20 planning June 2023, amended Nov 2025; IE licence applied mid-2026"A grant of planning permission was issued by WCC for the data centre in June of 2023 (WCC Ref 23/72)" EPA P1240-01: Attachment-1-2-Non-Technical-Summary_7.pdf, p.6
Heat reuseserver heat to heat offices only"there is scope to use heat generated by the servers to heat the offices associated with proposed development" ACP 303938 inspector report, p.29
2019 scheme
Renewablesc. 2.7 ha onsite solar PV farm"The construction of a solar farm development consisting of photovoltaic (PV) panel arrays covering an area of approximately c. 2.7 ha" WicklowCC ePlan register entry 2560594 (development description), p.1

Every value is quoted from the document and page cited; the quote was checked against that page's text. "Derived" means the reader worked it out from stated figures (shown in the quote). Planning and licence figures are design or permitted values, not measured use; values derived from an EPA annual environmental report (AER), mostly water, are reported use for that year. The note under each quote gives the scope and whether a demand figure is a maximum or an average.

Planning history

ReceivedRefWhatDecisionBuilt?
2025-10-092560806
The proposed development seeks permission to amend the development permitted under WCC Reg. Ref.: 23/72 and will consist of the following: • Reconfiguration of the internal layout of the 3-no. permitted ICT facility buildings to include ICT equipment rooms, mechanical rooms, switch rooms, electrical equipment rooms, office accommodation, storage and staff facilities at ground and first floor levels; • Amendments to the southern façade on all ICT facility buildings to include alterations to fenestration, extension of permitted louvered façade treatment, and associated alterations; • An increase
CONDITIONALunstarted, permission live
2025-08-012560594
• 1 no. ICT facility building with a gross floor area (GFA) of c. 36,655 sq.m and a total parapet height of c.19.5m. • 2 no. ICT facilities each with a GFA of c. 4,428 sq.m and a total parapet height of c. 10.5m. • Each of the ICT facilities will accommodate ICT equipment rooms, external mechanical equipment areas, electrical equipment rooms, network rooms, ancillary office space, storage and loading bays; • The construction of a solar farm development consisting of photovoltaic (PV) panel arrays covering an area of approximately c. 2.7 ha in the east of the site, on ground mounted steel frame
CONDITIONALunstarted, permission live
2023-01-272372
the proposed development occupies part of the site of (and will supersede) a previously permitted data centre development under Reg. Ref. 20/1285. The proposed development, for which a ten-year permission is sought, consists of the following: Demolition of the existing structures on site (industrial structures and outbuildings) and site clearance works; construction of 3 no. three storey information and communication technology (ICT) facility buildings, each with a gross floor area (GFA) of c. 16,206 sq.m (c. 48,618sq.m GFA in total), and with a parapet height of c. 19.5 metres; each of the 3
CONDITIONALunstarted, permission live
2021-08-31211080
Full ten-year planning permission for development on this site located at Avoca River Park, Arklow, Co. Wicklow. The proposed development is to be located within the townlands of Shelton Abbey and Marsh. The site is bound to the west by the site of a permitted data storage facility development (permitted under Reg. Ref.: 201285), to the north by the access road to Avoca River Park, to the south by undeveloped lands and to the east by undeveloped lands beyond which is the M11 motorway. The proposed development consists of the following: •All site clearance and enabling works required to facilit
CONDITIONALunstarted, permission live
2020-12-15201285
1. Demolition of existing ind building units totalling (C.2784.4m2) comprising of a c.7.1m high Overall Main Building (c.2460m2), a c.4.2m high Sub-station (c. 107.3m2), a c.3.6m high Guardhouse (c.106.2m2), a c.3.6m high East-Building (c.39.1m2), c.5m high Water Tank (c.56.8m2) &c.2.6m high Pump House Building (c.15.1m2), assoc works. 2. Dev of 3 no. Data Centre Buildings, ancillary offices & plant comprising of: Data Centre Building A, - a single storey Data Centre Building, with mezzanine 1st floor level offices (GFA c.10,564m2, building height c.13,658m & structures c.15,137m), made up of
CONDITIONALlapsed without commencement notice
2020-12-08201247
1. Demolition of existing ind building units totalling (C.2784.4m2) comprising of a c.7.1m high Overall Main Building (c.2460m2), a c.4.2m high Sub-station (c. 107.3m2), a c.3.6m high Guardhouse (c.106.2m2), a c.3.6m high East-Building (c.39.1m2), c.5m high Water Tank (c.56.8m2) &c.2.6m high Pump House Building (c.15.1m2), assoc works. 2. Dev of 3 no. Data Centre Buildings, ancillary offices & plant comprising of: Data Centre Building A, - a single storey Data Centre Building, with mezzanine 1st floor level offices (GFA c.10,564m2, building height c.13,658m & structures c.15,137m), made up of
N/Awithdrawn/invalid/undecided
2018-08-2018940
demolition of buildings & structures on site & construction of Data Storage Facility comprising 3 data storage buildings & all assoc site infrastructure: data storage facility 1 (6 Pod Data Centre) located to north of site served by 1 gas generator compound to south of Data Storage building including 5 flues & 2 bunded fuel tanks located to south east & south west of Data Storage building & powered by (-part grid / - part gas) with emergency diesel fuel backup. Data storage facility 2 (8 pod data centre) located to south of Data Storage Facility 1 served by 1 gas generator compound to the sout
CONDITIONALlapsed without commencement notice
2018-08-1018914
demolition of buildings & structures on site & construction of Data Storage Facility comprising 3 data storage buildings & all assoc site infrastructure: data storage facility 1 (6 Pod Data Centre) located to north of site served by 1 gas generator compound to south of Data Storage building including 5 flues & 2 bunded fuel tanks located to south east & south west of Data Storage building & powered by (-part grid / - part gas) with emergency diesel fuel backup. Data storage facility 2 (8 pod data centre) located to south of Data Storage Facility 1 served by 1 gas generator compound to the sout
N/Awithdrawn/invalid/undecided
Appeal 303938 (18940) · grant, 2019-07-17
Grid: 110 kV · EirGrid offer to connect to the transmission network received
Issues: flood risk · energy use (appellant: MIC = 6.6% of grid) · prematurity vs another Wicklow data centre
"The proposed has 7 10MVA Gas Engines and 24 2.5MVA Backup Generators." p.29
"the Maximum Import Capacity for the proposal is 50 MVA" p.37

Sources for this page

osm:way/1559986487 · osm:way/1559986488 · epa:P1240 · epa:P1202 · planning:WICKLOW/18914 · planning:WICKLOW/18940 · planning:WICKLOW/201247 · planning:WICKLOW/201285 · planning:WICKLOW/211080 · planning:WICKLOW/2372 · planning:WICKLOW/2560594 · planning:WICKLOW/2560806 · planning:WICKLOW/23843 · planning:WICKLOW/SI202102 · acp:303938

Joined from OpenStreetMap, the planning register, An Coimisiún Pleanála, EPA licences and annual reports, the Tailte Éireann valuation list and Building Control. Data built 2026-10-10.