Data centre · South Dublin · 53.3310, -6.3825
Echelon Crag Avenue, Clondalkin
operating Echelon Our classification · status
Not available for this site: measured grid draw (no EPA annual report: only sites with ≥50 MWth of plant file one).
Why we say it's operating
- EPA P1113: on-site generators licensed and in use (Licensable Activity Commenced)
- Valuation list: property 10035536 rated as DATA CENTRE
- Planning SD20A/0309: completion certificate 2025-06-24
- Planning SD19A/0185: completion certificate 2021-11-15
What's next on this site
- permitted: Planning SD20A/0242: unstarted, permission live
- permitted: Planning SD22A/0093: unstarted, expires within 12 months (expires 2027-08-30)
- permitted: Planning SD25A/0257W: commenced (no completion certificate on a main building yet)
- permitted: Planning SD25A/0301W: unstarted, permission live (expires 2031-05-19)
- permitted: Planning SD20A/0309/EP: unstarted, permission live
- proposed: Planning SD24A/0201W: appeal pending
Who runs it
- EPA licensee 'Crag Digital Limited' -> Echelon (operator SPV; high-confidence entity link from CRO, EPA, planning)
- EPA licensee 'Echelon Clondalkin DC Services Limited' -> Echelon (operator SPV; high-confidence entity link from CRO, EPA)
- planning applicant
- planning applicant 'Crag Digital Limited' -> Echelon (operator SPV; high-confidence entity link from CRO, EPA, planning)
- other names on records here: eir
- some records attributed by co-location only (no operator in their own source)






Generators and power
| EPA licence | Status | Role | MWth | Plant | Permitted hours |
|---|---|---|---|---|---|
| P1113 | Licensed · Licensable Activity Commenced | primary-gas | 598.2 | 8 combined-cycle gas turbines (5 x 46 + 3 x 42 MWth) + 2 x 46 MWth open-cycle gas turbines + 6 x 5.9 MWth black-start + 21 x 5.4 MWth backup diesel (plus 2 x 0.7 MWth fire pumps) | Gas turbines continuously (8,760 h/yr); <=100 h/yr on liquid fuel; backup diesels <=100 h/yr |
| P1066 | Withdrawn · | primary-gas | 487.71 | 8 x 24.87 MWth gas engines (12 MWe each; 7 running base load) + 35 x 8.25 MWth (3.3 MWe) standby diesels | Gas engines continuous base load |
What the planning and licence documents say
Figures are for the P1113-02 licence review design (2023-25): on-site gas-turbine energy centre plus 4 ICTF buildings; IT load is from the superseded 2020 P1113-01 design.
Every value is quoted from the document and page cited; the quote was checked against that page's text. "Derived" means the reader worked it out from stated figures (shown in the quote). Planning and licence figures are design or permitted values, not measured use; values derived from an EPA annual environmental report (AER), mostly water, are reported use for that year. The note under each quote gives the scope and whether a demand figure is a maximum or an average.
Planning history
| Received | Ref | What | Decision | Built? |
|---|---|---|---|---|
| 2026-04-27 | SD20A/0309/EP | Provision of 4 new information and communications technology (ICT) Facility buildings and associated development at the subject site, superseding elements of the extant planning permissions on site (Reg. Ref.: SD18A/0068 and Reg, Ref.: SD19A/0185). The application site is subject to an EPA Industrial Emissions Licence (Ref. No,: P1113-01) relating to the Energy Centre permitted on site, The single storey Energy Centre, gas pressure reduction station, and 110kV Gas Insulated Switchgear (GIS) substation permitted under Reg, Ref.: SD18AI0068 and Reg. Ref.: SD19AI0185 will be constructed as previo | Grant Extension of Duration of Permission | unstarted, permission live |
| 2026-03-12 | SD25A/0301W | The development comprises the retention of the following amendments to the development permitted under Reg. Ref.: SD20A/0309, as amended by Reg. Ref.: SD22A/0093 and Reg. Ref.: SD23A/0158, which arose during the detailed design / construction stage of the project: Amendments at plant and roof level including the reconfiguration of plant and associated extracts, provision of a roof level package plantroom, provision of 2 no. backup landlord generators, reconfigured gantry associated with the 2 no. back-up landlord generators, and reconfiguration of solar PV panels; The provision of 2 no. pumpro | Grant Permission for Retention | unstarted, permission live |
| 2026-01-27 | SD25A/0257W | Permission and retention permission is sought for the following development: Permission for an ancillary generator structure with a total height of c. 22m located between ICT Facility 2 and ICT Facility 3 including 13 no. double-stacked back-up generators with flues of c. 25m, fuel storage, transformers, and associated electrical equipment and plant. Permission for 13 no. ancillary generators within a fenced compound, with a total height of c. 8.1m located to the north of ICT Facility 3, including 13 no. back-up generators with flues of c. 25m, fuel storage tanks and fuel pump room building, t | Grant Permission & Grant Retention | commenced (no completion certificate on a main building yet) |
| 2024-08-21 | SD24A/0201W | Construction of an ICT facility building, revised internal road network and all associated site works. An EPA-Industrial Emissions Directive (IE) licence will be required to facilitate the operation of the proposed development. | Refuse Permission | appeal pending |
| 2022-06-23 | SD22A/0093 | Amendments to the development permitted under Reg. Ref. SD20A/0309 comprising: alterations to permitted ICT Facility buildings 2 and 3, to include internal reconfiguration of the ICT equipment halls, associated electrical and mechanical plant rooms, loading bays, maintenance and storage space, office administration areas, and reconfiguration of screened plant; alterations to the external facades of permitted ICT Facility buildings 2 and 3 to include modification and reconfiguration of fenestration, louvers, loading bays, and access doors, along with an increase in height of 1.2 metres to main | Grant Permission | unstarted, expires within 12 months |
| 2021-02-24 | SD20A/0309 | Provision of 4 new information and communications technology (ICT) Facility buildings and associated development at the subject site, superseding elements of the extant planning permissions on site (Reg. Ref.: SD18A/0068 and Reg, Ref.: SD19A/0185). The application site is subject to an EPA Industrial Emissions Licence (Ref. No,: P1113-01) relating to the Energy Centre permitted on site, The single storey Energy Centre, gas pressure reduction station, and 110kV Gas Insulated Switchgear (GIS) substation permitted under Reg, Ref.: SD18AI0068 and Reg. Ref.: SD19AI0185 will be constructed as previo | Grant Permission | completed (completion certificate) |
| 2020-12-01 | SD20A/0242 | The provision of alternate entrance and access arrangements from Crag Avenue to serve the permitted data storage centre, energy centre and substation development permitted under Reg. Ref. SD18A/0068, as amended by Reg. Ref. SD19A/0185 including the provision of ducted services connections between the permitted substation on site (permitted under Reg. Ref. SD18A/0068 as amended by Reg. Ref. SD19A/0185) and existing services to the south of the Grand Canal. The proposed ducted services connections will exit the permitted substation compound and run southward, crossing beneath the Grand Canal by | Grant Permission | unstarted, permission live |
| 2018-10-23 | SD18A/0068 | Construction of data centre and combined heat and power plant (Energy Centre) with ancillary operations building and associated site works. | Grant Permission | lapsed without commencement notice |
| 2013-12-23 | SD13A/0271 | Demolition of existing logistics centre and associated ancillary buildings; retention of existing mobile phone mast and ancillary plant; the construction of a two storey data centre with a gross floor area of 43,805sq.m.; two storey ancillary office building of 4,308sq.m. gross floor area; associated single storey combined heat and power plant (Energy Centre) with a gross floor area of 5,306sq.m. with ancillary two storey operations building with a gross floor area of 2,322sq.m. and single storey generator building 228sq.m. The Data Centre shall comprise the following uses: offices, computer a | Grant Permission & Grant Retention | lapsed without commencement notice |
Sources for this page
osm:way/1124890822 · osm:way/1124890821 · epa:P1113 · epa:P1066 · valuation:10035536 · planning:SDCC/SD13A/0271 · planning:SDCC/SD18A/0068 · planning:SDCC/SD20A/0242 · planning:SDCC/SD20A/0309 · planning:SDCC/SD22A/0093 · planning:SDCC/SD24A/0201W · planning:SDCC/SD25A/0257W · planning:SDCC/SD25A/0301W · planning:SDCC/SD20A/0309/EP · planning:SDCC/SD19A/0185 · acp:243151 · acp:303517 · acp:321230
Joined from OpenStreetMap, the planning register, An Coimisiún Pleanála, EPA licences and annual reports, the Tailte Éireann valuation list and Building Control. Data built 2026-10-10.