Data centre · South Dublin · 53.3283, -6.4574
EdgeConneX Newcastle Road, Lucan
operating EdgeConneX Our classification · status
Not available for this site: measured grid draw (no EPA annual report: only sites with ≥50 MWth of plant file one).
Why we say it's operating
- Valuation list: property 10036023 rated as DATA CENTRE
- Valuation list: property 5015886 rated as DATA CENTRE
- Planning SD16A/0214: completion certificate 2017-07-21
- Planning SD16A/0345: completion certificate 2017-10-04
- Planning SD17A/0141: completion certificate 2022-03-31
- Planning SD18A/0298: completion certificate 2021-07-01
- Planning SD19A/0042: completion certificate 2024-12-19
- Planning SD21A/0042: completion certificate 2025-02-24
What's next on this site
- under construction: Planning SD17A/0392: commencement notice 2021-05-06, no completion certificate
- permitted: EPA P1204: generators licensed, activity not commenced
- permitted: Planning SD20A/0031: unstarted, permission live
- permitted: Planning SD21A/0127: unstarted, permission live
- permitted: Planning SD22A/0333: unstarted, permission live (expires 2030-07-31)
- permitted: Planning SD23A/0151: unstarted, permission live (expires 2028-10-02)
- permitted: Planning SD22A/0025: unstarted (live permission, no commencement notice) (expires 2027-05-12)
- permitted: Planning SD16A/0176: commenced (BCMS notice, no completion certificate) (expires 2021-08-26)
- permitted: Planning SD22A/0009: unstarted (live permission, no commencement notice) (expires 2027-10-03)
Who runs it
- EPA licensee 'EdgeConneX Ireland Limited'
- OSM operator tag 'EdgeConneX'
- planning applicant
- planning applicant 'EdgeConneX Ireland Limited'
- some records attributed by co-location only (no operator in their own source)
- some planning records joined by their planning history (cross-referenced refs, same site) and name no operator themselves




Generators and power
| EPA licence | Status | Role | MWth | Plant | Permitted hours |
|---|---|---|---|---|---|
| P1204 | Licensed · Not Commenced | gas-flex | 537.2 | 20 x 10.3 MWth gas engines (energy centre) + 48 x 6.9 MWth backup diesel | Up to 18 gas engines continuously as instructed by EirGrid; backup diesels <=100 h/yr each |
What the planning and licence documents say
EdgeConneX Facility Campus west of the R120 (Ballymakaily): EDCDUB04 and EDCDUB05 (4 data halls) plus energy centre ESSDUB97 under EPA licence P1204-01 (2025), and DUB06 (2 further halls, granted on appeal ABP-317802, Jul 2025) as the third and final phase; earlier ACP 300752 relates to the existing DUB01-03 campus east of the R120.
Every value is quoted from the document and page cited; the quote was checked against that page's text. "Derived" means the reader worked it out from stated figures (shown in the quote). Planning and licence figures are design or permitted values, not measured use; values derived from an EPA annual environmental report (AER), mostly water, are reported use for that year. The note under each quote gives the scope and whether a demand figure is a maximum or an average.
Planning history
| Received | Ref | What | Decision | Built? |
|---|---|---|---|---|
| 2023-07-05 | SD23A/0151 | Permission for development at this site within the townland of Ballymakaily to the west of the Newcastle Road, Lucan, Co. Dublin. The development will consist of amendments to the permitted development as granted under SDCC Planning Ref. SD19A/0042 that will include: - Reduction in the number of back-up generators, flues and other related plant from 32 to 24 within the permitted generator compound located to the west of the data centre granted under SDCC Planning Ref. SD19A/0042; and - Repositioning of the 24 no. back-up generators, flues and other plant within the permitted generator compound | Grant Permission | unstarted, permission live |
| 2023-05-26 | SD22A/0333 | Construction of 2 adjoined single storey data centres with associated site works. An Environmental Impact Assessment Report (EIAR) has been submitted with this application. | Refuse Permission | unstarted, permission live |
| 2021-12-14 | SD21A/0042 | Demolition of abandoned house, shed and derelict farm building. Construction of 2 data centres and 3 gas powered generation plants. EIAR submitted to PA. | Grant Permission | completed (completion certificate) |
| 2021-05-21 | SD21A/0127 | Retention of 1 standby diesel generator with an associated flue (15m high) within the permitted generator compound located to the east of the data centre granted under SDCC Reg. SD16A/0345 increasing the number of standby diesel generators from 5 to 6 within the permitted compound. | Grant Permission for Retention | unstarted, permission live |
| 2020-02-03 | SD20A/0031 | Relocation of the temporary gas powered generation plant for a further two years from lands to the rear of the Takeda Ireland complex to the east of the site; to lands to the immediate north-west within the Edgeconnex campus and to the immediate east of the data centre granted and built under Reg. Ref. SD17A/0141 and SD17A/0392; the relocated temporary gas powered generation plant will be enclosed within a walled yard of 2,836sq.m containing 12 generator units with associated flues (each 15m high) that was permitted for a period of three years on the 15th May 2017 under condition No. 4 of perm | Grant Permission | unstarted, permission live |
| 2019-08-29 | SD19A/0042 | Phased development of 4 single storey data halls all with associated plant at roof level, 32 standby generators, office and service areas, service road infrastructure, car parking, ESB substation/transformer yard, An EIAR was submitted with the application. | Grant Permission | completed (completion certificate) |
| 2018-08-22 | SD18A/0298 | Amendment and completion of the permissions granted under Reg. Ref. SD16A/0214, SD16A/0345, SD17A/0141 and SD17A/0392 as well as the construction of two new single storey data halls and associated office areas and plant, with a gross floor area of 5,823sq.m. 1 new single storey data hall (1,857sq.m) plus single storey offices (719sq.m) will be located to the immediate east of the data hall that was permitted and subsequently extended under Reg. Ref. SD17A/0141 and SD17A/0392. The new data hall will include plant at roof level; associated support services, 4 standby generators with associated f | Grant Permission | completed (completion certificate) |
| 2017-11-03 | SD17A/0392 | Amendment and completion of the permission granted under SD17A/0141 to facilitate a 125sq.m extension to the north and south of the permitted stand-alone single storey data hall of 1,515sq.m to create an extended stand-alone single storey data hall of 1,640s.qm. | Grant Permission | commenced (no completion certificate on a main building yet) |
| 2017-05-11 | SD17A/0141 | Construction of a new stand-alone data hall of 1,515sq.m that will be located to the north of the data hall and its extension, and to the west of the temporary gas powered generation plant permitted under Reg. Ref. SD16A/0214 and SD16A/0345 and to the immediate east of the R120. The new data hall will include plant at roof level; associated support services, 4 standby generators with associated flues (each 15m high). The development will also include ancillary site works, a new water tower, pump room and connections to existing Grange Castle infrastructural services as well as fencing, signage | Grant Permission | completed (completion certificate) |
| 2017-02-09 | SD17A/0027 | Amendment of permission granted under SD16A/0345 that will relocate the temporary gas powered generation plant from lands to the rear of the Takeda Ireland complex to the east of the site, to lands to the immediate north of Phase 1 data hall and single storey office granted under SD16A/0214 and to the south of the ESB substation and transformer yard that was permitted under SD16A/0345. The relocated temporary gas powered generation plant will be enclosed within a walled yard containing 12 generator units with associated flues (each 15m high). The development will also include new vehicular acc | Grant Permission | lapsed without commencement notice |
| 2016-10-04 | SD16A/0345 | Construction of a new single storey data hall of 4,176sq.m as an extension to the immediate south of the data hall and single storey office (5,776sq.m) permitted under Reg. Ref. SD16A/0214 to create an overall development of 9,952sq.m. The new data hall will include plant at roof level, associated support services, 5 standby generators with associated flues (each 15m high) and services road. The development will also include a temporary gas powered generation plant within a walled yard containing 12 generator units with associated flues (each 15m high) to be located within and to the rear of t | Grant Permission | completed (completion certificate) |
| 2016-06-20 | SD16A/0214 | Construction of a single storey data centre (4,435sq.m) with plant at roof level: associated support services and 6 standby generators with associated flues (each 15m high): and single storey office and loading bay (1,341sq.m) as well as an electricity sub-station (63sq.m) with a total floor area of 5,839sq.m. The development will also include ancillary site works, including attenuation tank, to connect to existing Grange Castle infrastructural services as well as fencing, signage, services road, entrance gate, 26 car parking spaces including 2 disabled car parking spaces, as well as sheltered | Grant Permission | completed (completion certificate) |
Sources for this page
osm:way/1375543041 · osm:way/1231956437 · osm:way/709143741 · osm:way/1004745825 · epa:P1204 · valuation:10036023 · valuation:5015886 · planning:SDCC/SD16A/0214 · planning:SDCC/SD16A/0345 · planning:SDCC/SD17A/0027 · planning:SDCC/SD17A/0141 · planning:SDCC/SD17A/0392 · planning:SDCC/SD18A/0298 · planning:SDCC/SD19A/0042 · planning:SDCC/SD20A/0031 · planning:SDCC/SD21A/0127 · planning:SDCC/SD21A/0042 · planning:SDCC/SD22A/0333 · planning:SDCC/SD23A/0151 · planning:SDCC/SD22A/0025 · planning:SDCC/SD16A/0176 · planning:SDCC/SD19A/0342 · planning:SDCC/SD22A/0105 · planning:SDCC/SD22A/0009 · planning:SDCC/SD22A/0289 · planning:SDCC/SD19A/0004 · acp:300752 · acp:305948 · acp:312749 · acp:317802
Joined from OpenStreetMap, the planning register, An Coimisiún Pleanála, EPA licences and annual reports, the Tailte Éireann valuation list and Building Control. Data built 2026-10-10.