Data centre · South Dublin · 53.3283, -6.4574

← All data centres

EdgeConneX Newcastle Road, Lucan

operating EdgeConneX Our classification · status

537 MWth
On-site generation licensed
gas-flex
4.9 ha
Building footprint mapped
4 buildings · OSM
€6m
Estimated rates a year
NAV €21.4m
2017
First completion certificate
Grid connection. Flexible (EirGrid 'Flexible Demand' offer; agreement signed, bond and charges paid). "given the applicant has a ‘Flexible Demand Offer’ with EirGrid, there is a risk the installation may be instructed to reduce their electricity load" (EPA P1204-01: Inspectors Report_22.pdf, p.3)

Not available for this site: measured grid draw (no EPA annual report: only sites with ≥50 MWth of plant file one).

Why we say it's operating

  • Valuation list: property 10036023 rated as DATA CENTRE
  • Valuation list: property 5015886 rated as DATA CENTRE
  • Planning SD16A/0214: completion certificate 2017-07-21
  • Planning SD16A/0345: completion certificate 2017-10-04
  • Planning SD17A/0141: completion certificate 2022-03-31
  • Planning SD18A/0298: completion certificate 2021-07-01
  • Planning SD19A/0042: completion certificate 2024-12-19
  • Planning SD21A/0042: completion certificate 2025-02-24

What's next on this site

  • under construction: Planning SD17A/0392: commencement notice 2021-05-06, no completion certificate
  • permitted: EPA P1204: generators licensed, activity not commenced
  • permitted: Planning SD20A/0031: unstarted, permission live
  • permitted: Planning SD21A/0127: unstarted, permission live
  • permitted: Planning SD22A/0333: unstarted, permission live (expires 2030-07-31)
  • permitted: Planning SD23A/0151: unstarted, permission live (expires 2028-10-02)
  • permitted: Planning SD22A/0025: unstarted (live permission, no commencement notice) (expires 2027-05-12)
  • permitted: Planning SD16A/0176: commenced (BCMS notice, no completion certificate) (expires 2021-08-26)
  • permitted: Planning SD22A/0009: unstarted (live permission, no commencement notice) (expires 2027-10-03)

Who runs it

  • EPA licensee 'EdgeConneX Ireland Limited'
  • OSM operator tag 'EdgeConneX'
  • planning applicant
  • planning applicant 'EdgeConneX Ireland Limited'
  • some records attributed by co-location only (no operator in their own source)
  • some planning records joined by their planning history (cross-referenced refs, same site) and name no operator themselves
Leaflet © OpenStreetMap contributors

Generators and power

EPA licenceStatusRoleMWthPlantPermitted hours
P1204Licensed · Not Commencedgas-flex537.220 x 10.3 MWth gas engines (energy centre) + 48 x 6.9 MWth backup dieselUp to 18 gas engines continuously as instructed by EirGrid; backup diesels <=100 h/yr each

What the planning and licence documents say

EdgeConneX Facility Campus west of the R120 (Ballymakaily): EDCDUB04 and EDCDUB05 (4 data halls) plus energy centre ESSDUB97 under EPA licence P1204-01 (2025), and DUB06 (2 further halls, granted on appeal ABP-317802, Jul 2025) as the third and final phase; earlier ACP 300752 relates to the existing DUB01-03 campus east of the R120.

SpecValueQuote and source
Grid voltage110 kV"will be provided via the permitted two storey 110kV GIS Substation (Kishoge)" ACP 317802 inspector report, p.5
Connection pointKishoge 110kV GIS substation (on campus), looped into Aungierstown-Castlebaggot 110kV line (ABP-314567-22)"connected via an 110kV transmission line from the permitted 110kV transmission line at Aungierstown - Castlebaggot" ACP 317802 inspector report, p.5
Connection termsflexible (EirGrid 'Flexible Demand' offer; agreement signed, bond and charges paid)"given the applicant has a ‘Flexible Demand Offer’ with EirGrid, there is a risk the installation may be instructed to reduce their electricity load" EPA P1204-01: Inspectors Report_22.pdf, p.3
MIC not disclosed
On-site generationgas engines (energy centre ESSDUB97) as alternative/flexible-demand power; diesel emergency backup generators"the energy centre will act as the alternative source of power for the site when required" EPA P1204-01: Inspectors Report_22.pdf, p.4
Generating units20 units"ESSDUB97 will contain 20 no. 10.3 MWth gas engines (18 no. operational and 2 no. back-up)" EPA P1204-01: Inspectors Report_22.pdf, p.4
licensed energy centre only; permitted ESSDUB95/96 (41 more engines) not currently required; plus 48 diesel backup generators (DUB04/05) and 24 for DUB06
On-site thermal input537.2 MWth"The combined thermal input (total capacity) from the gas plant and emergency diesel generators is 537.20 MWth" EPA P1204-01: Attachment-4-4-1-Capacity Calculations_18.pdf, p.1
gas engines 20 x 10.3 = 206 MWth + 48 x 6.9 MWth diesel
Fuelnatural gas (engines); gas oil / diesel for backup (DUB06 backup to use HVO by condition)"The gas engines will only operate on natural gas and within the timeframe as instructed by EirGrid." EPA P1204-01: Inspectors Report_22.pdf, p.1
Running hoursgas engines up to ~500 h/yr in winter peaks (EirGrid flexible demand); backup generators <=100 h/yr each"This would be in multiple individual intervals during peak daily usage in winter that is estimated up to 500 hours per annum." ACP 317802 inspector report, p.6
EPA licence: back-up generators no more than 100 hours per generator per annum; gas engines licensed to run continuously as instructed by EirGrid
Coolingclosed-loop glycol cooling with chillers (no water consumed for cooling)"This closed-loop design is more sustainable as it doesn't consume water during cooling." EPA P1204-01: Attachment-1-2-Non Technical Summary_16.pdf, p.7
Water6 m3/day"The proposed development will result in an increased demand for water of c. 6 m3/day (average)." ACP 317802 inspector report, p.99
DUB06 only; DUB04/05 have no industrial water demand
Floor area26,697 m2 (derived)"EDCDUB04 consists of 2 no. single storey data centres (c. 13,900sqm)" EPA P1204-01: Attachment-1-2-Non Technical Summary_16.pdf, p.3
derived: DUB04 13,900 + DUB05 12,797 m2 (same page: EDCDUB05 consists of 2 no. single storey data centres (c. 12,797sqm)); DUB04 + DUB05 data centre areas (excl. offices); DUB06 adds 15,274 m2 GFA
Data halls4 halls"1 no. energy centre building and 4 no. single storey data centres" EPA P1204-01: Attachment-1-2-Non Technical Summary_16.pdf, p.3
DUB04 + DUB05; DUB06 adds 2 adjoined data centres
PhasingDUB04 + DUB05 + ESSDUB97 licensed; DUB06 is the third and final phase"of which the proposed development will represent the third and final phase" ACP 317802 Board order, p.3
Datesgas plants limited to 5 years from first operation unless renewed (later amended to GNI green gas review and removal once firm grid offer)"Five (5) years from the date the first gas plant first commences operation, the gas plants" ACP 317802 inspector report, p.15
Heat reuseDUB06 must show how it will connect to a future district heating network (condition)"details to demonstrate how a connection to a future district heating network will be facilitated on site" ACP 317802 Board order, p.10
RenewablesCPPA required before DUB06 operates (condition); KPMG engaged to acquire CPPAs; 50kWe rooftop PV"details of a Corporate Purchase Power Agreement that the developer has entered into" ACP 317802 Board order, p.10
Commission condition 4 (ABP-317802)

Every value is quoted from the document and page cited; the quote was checked against that page's text. "Derived" means the reader worked it out from stated figures (shown in the quote). Planning and licence figures are design or permitted values, not measured use; values derived from an EPA annual environmental report (AER), mostly water, are reported use for that year. The note under each quote gives the scope and whether a demand figure is a maximum or an average.

Planning history

ReceivedRefWhatDecisionBuilt?
2023-07-05SD23A/0151
Permission for development at this site within the townland of Ballymakaily to the west of the Newcastle Road, Lucan, Co. Dublin. The development will consist of amendments to the permitted development as granted under SDCC Planning Ref. SD19A/0042 that will include: - Reduction in the number of back-up generators, flues and other related plant from 32 to 24 within the permitted generator compound located to the west of the data centre granted under SDCC Planning Ref. SD19A/0042; and - Repositioning of the 24 no. back-up generators, flues and other plant within the permitted generator compound
Grant Permissionunstarted, permission live
2023-05-26SD22A/0333
Construction of 2 adjoined single storey data centres with associated site works. An Environmental Impact Assessment Report (EIAR) has been submitted with this application.
Refuse Permissionunstarted, permission live
2021-12-14SD21A/0042
Demolition of abandoned house, shed and derelict farm building. Construction of 2 data centres and 3 gas powered generation plants. EIAR submitted to PA.
Grant Permissioncompleted (completion certificate)
2021-05-21SD21A/0127
Retention of 1 standby diesel generator with an associated flue (15m high) within the permitted generator compound located to the east of the data centre granted under SDCC Reg. SD16A/0345 increasing the number of standby diesel generators from 5 to 6 within the permitted compound.
Grant Permission for Retentionunstarted, permission live
2020-02-03SD20A/0031
Relocation of the temporary gas powered generation plant for a further two years from lands to the rear of the Takeda Ireland complex to the east of the site; to lands to the immediate north-west within the Edgeconnex campus and to the immediate east of the data centre granted and built under Reg. Ref. SD17A/0141 and SD17A/0392; the relocated temporary gas powered generation plant will be enclosed within a walled yard of 2,836sq.m containing 12 generator units with associated flues (each 15m high) that was permitted for a period of three years on the 15th May 2017 under condition No. 4 of perm
Grant Permissionunstarted, permission live
2019-08-29SD19A/0042
Phased development of 4 single storey data halls all with associated plant at roof level, 32 standby generators, office and service areas, service road infrastructure, car parking, ESB substation/transformer yard, An EIAR was submitted with the application.
Grant Permissioncompleted (completion certificate)
2018-08-22SD18A/0298
Amendment and completion of the permissions granted under Reg. Ref. SD16A/0214, SD16A/0345, SD17A/0141 and SD17A/0392 as well as the construction of two new single storey data halls and associated office areas and plant, with a gross floor area of 5,823sq.m. 1 new single storey data hall (1,857sq.m) plus single storey offices (719sq.m) will be located to the immediate east of the data hall that was permitted and subsequently extended under Reg. Ref. SD17A/0141 and SD17A/0392. The new data hall will include plant at roof level; associated support services, 4 standby generators with associated f
Grant Permissioncompleted (completion certificate)
2017-11-03SD17A/0392
Amendment and completion of the permission granted under SD17A/0141 to facilitate a 125sq.m extension to the north and south of the permitted stand-alone single storey data hall of 1,515sq.m to create an extended stand-alone single storey data hall of 1,640s.qm.
Grant Permissioncommenced (no completion certificate on a main building yet)
2017-05-11SD17A/0141
Construction of a new stand-alone data hall of 1,515sq.m that will be located to the north of the data hall and its extension, and to the west of the temporary gas powered generation plant permitted under Reg. Ref. SD16A/0214 and SD16A/0345 and to the immediate east of the R120. The new data hall will include plant at roof level; associated support services, 4 standby generators with associated flues (each 15m high). The development will also include ancillary site works, a new water tower, pump room and connections to existing Grange Castle infrastructural services as well as fencing, signage
Grant Permissioncompleted (completion certificate)
2017-02-09SD17A/0027
Amendment of permission granted under SD16A/0345 that will relocate the temporary gas powered generation plant from lands to the rear of the Takeda Ireland complex to the east of the site, to lands to the immediate north of Phase 1 data hall and single storey office granted under SD16A/0214 and to the south of the ESB substation and transformer yard that was permitted under SD16A/0345. The relocated temporary gas powered generation plant will be enclosed within a walled yard containing 12 generator units with associated flues (each 15m high). The development will also include new vehicular acc
Grant Permissionlapsed without commencement notice
2016-10-04SD16A/0345
Construction of a new single storey data hall of 4,176sq.m as an extension to the immediate south of the data hall and single storey office (5,776sq.m) permitted under Reg. Ref. SD16A/0214 to create an overall development of 9,952sq.m. The new data hall will include plant at roof level, associated support services, 5 standby generators with associated flues (each 15m high) and services road. The development will also include a temporary gas powered generation plant within a walled yard containing 12 generator units with associated flues (each 15m high) to be located within and to the rear of t
Grant Permissioncompleted (completion certificate)
2016-06-20SD16A/0214
Construction of a single storey data centre (4,435sq.m) with plant at roof level: associated support services and 6 standby generators with associated flues (each 15m high): and single storey office and loading bay (1,341sq.m) as well as an electricity sub-station (63sq.m) with a total floor area of 5,839sq.m. The development will also include ancillary site works, including attenuation tank, to connect to existing Grange Castle infrastructural services as well as fencing, signage, services road, entrance gate, 26 car parking spaces including 2 disabled car parking spaces, as well as sheltered
Grant Permissioncompleted (completion certificate)
Appeal 300752 (SD17A/0392) · grant, 2018-07-26
Grid: limited capacity on the local network; grid upgrade expected 2019
Issues: flood risk / attenuation (appellant) · temporary gas generation due to grid limits
"permitted to construct a temporary gas generator as a result of the limited capacity available on the electricity utility network" p.40
Appeal 305948 (SD19A/0042) · grant, 2020-10-05
Grid: limited utility capacity; grid connection predicted 2022
Issues: temporary gas plant powering data centre · waste heat · noise
"The temporary plant will operate on a continual basis until such time as the load demand can be accommodated on the electrical utility grid" p.47
"The gas connection feeding the generator farm will be provided at medium pressure by Gas Networks Ireland" p.47
Appeal 312749 (SD21A/0042) · withdrawn, 2022-03-08
Appeal 317802 (SD22A/0333) · grant, 2025-07-31
Grid: 110 kV · EirGrid 'Flexible Demand' connection agreement signed, bond and charges paid; MIC not disclosed
Issues: PA refused: grid capacity, reliance on gas · flexible demand offer · hedgerows / biodiversity · islanded risk shifting to gas security
Board: PA refused; Board (Coimisiún) granted on first-party appeal.
"this generation must be capable of running continuously for an extended period of time not limited by fuel reserves" p.6
"estimated up to 500 hours per annum" p.6

Sources for this page

osm:way/1375543041 · osm:way/1231956437 · osm:way/709143741 · osm:way/1004745825 · epa:P1204 · valuation:10036023 · valuation:5015886 · planning:SDCC/SD16A/0214 · planning:SDCC/SD16A/0345 · planning:SDCC/SD17A/0027 · planning:SDCC/SD17A/0141 · planning:SDCC/SD17A/0392 · planning:SDCC/SD18A/0298 · planning:SDCC/SD19A/0042 · planning:SDCC/SD20A/0031 · planning:SDCC/SD21A/0127 · planning:SDCC/SD21A/0042 · planning:SDCC/SD22A/0333 · planning:SDCC/SD23A/0151 · planning:SDCC/SD22A/0025 · planning:SDCC/SD16A/0176 · planning:SDCC/SD19A/0342 · planning:SDCC/SD22A/0105 · planning:SDCC/SD22A/0009 · planning:SDCC/SD22A/0289 · planning:SDCC/SD19A/0004 · acp:300752 · acp:305948 · acp:312749 · acp:317802

Joined from OpenStreetMap, the planning register, An Coimisiún Pleanála, EPA licences and annual reports, the Tailte Éireann valuation list and Building Control. Data built 2026-10-10.