Data centre · South Dublin · 53.2916, -6.4165
Keppel Citywest
operating Keppel (operator medium confidence) Our classification · status
Not available for this site: measured grid draw (no EPA annual report: only sites with ≥50 MWth of plant file one); mapped footprint; rates (no valuation-list entry matched).
Why we say it's operating
- Planning SD22A/0013: description refers to an existing data centre
- Planning SD23A/0339: description refers to an existing data centre
What's next on this site
- permitted: Planning SD22A/0013: unstarted, permission live
- permitted: Planning SD23A/0339: unstarted, permission live
Who runs it
- planning address names it ('Keppel Data Centre, Citywest Avenue, Citywest Business Campu')
- some records attributed by co-location only (no operator in their own source)




What the planning and licence documents say
Existing Keppel data centre at Citywest Business Park; cases concern containerised energy storage only (3 x 40ft containers, ABP-313603, 2023; 2 battery units + HV skids by Grid Beyond, ABP-320651, 2025). No MW/MWh figures stated.
| Spec | Value | Quote and source |
|---|---|---|
| On-site generation | existing generators on site (type/size not stated) | "There are a number of existing buildings and generators located within the rear portion of the site." ACP 313603 inspector report, p.2 |
| Phasing | energy storage in 3 x 40ft containers (c.108 m2), then 2 further battery storage units with HV skids | "two new battery storage units, two new HV power skids (PCS transformer and HV RMU), and two new MV transformers" ACP 320651 inspector report, p.2 batteries charge from grid at night and discharge at peak demand |
| Dates | first storage unit permitted Aug 2023 (temporary 3-year limit removed); second (SD23A/0339) decided 2025 | "The Board granted permission in August 2023, omitting Condition 2." ACP 320651 inspector report, p.4 |
Every value is quoted from the document and page cited; the quote was checked against that page's text. "Derived" means the reader worked it out from stated figures (shown in the quote). Planning and licence figures are design or permitted values, not measured use; values derived from an EPA annual environmental report (AER), mostly water, are reported use for that year. The note under each quote gives the scope and whether a demand figure is a maximum or an average.
Planning history
| Received | Ref | What | Decision | Built? |
|---|---|---|---|---|
| 2024-07-01 | SD23A/0339 | Installation of energy storage units at an existing datacentre facility. | Grant Permission | unstarted, permission live |
| 2022-03-24 | SD22A/0013 | The installation of an energy storage unit at an existing data centre facility. The development involves the placement of three ISO 40ft. shipping containers containing back up storage units at Keppel Data Centre. | Grant Permission | unstarted, permission live |
Sources for this page
planning:SDCC/SD22A/0013 · planning:SDCC/SD23A/0339 · acp:313603 · acp:320651
Joined from OpenStreetMap, the planning register, An Coimisiún Pleanála, EPA licences and annual reports, the Tailte Éireann valuation list and Building Control. Data built 2026-10-10.