Data centre · Fingal · 53.4077, -6.3507

← All data centres

Pure DC Orion Business Campus

operating Pure DC Our classification · status

1 MVA
Stated import capacity
planning documents · a ceiling, not use
197 MWth
On-site generation licensed
primary-gas
0.8 ha
Building footprint mapped
1 buildings · OSM
€0.3m
Estimated rates a year
NAV €1.6m
2023
First completion certificate
Grid connection. None for IT load (off-grid; no grid connection agreement). "There is no electricity grid connection agreement in place to power the main IT load of the data centres" (EPA P1210-01: Addendum Inspectors Report - P1210-01.pdf, p.6)

Not available for this site: measured grid draw (no EPA annual report: only sites with ≥50 MWth of plant file one).

Why we say it's operating

  • Valuation list: property 10034774 rated as DATA CENTRE

What's next on this site

  • under construction: Planning FW18A/0114: commencement notice 2022-04-12, no completion certificate
  • under construction: Planning FW24A/0246E: commencement notice 2025-02-17, no completion certificate
  • permitted: EPA P1210: generators licensed, activity not commenced
  • permitted: Planning FW26A/0021E: unstarted, permission live (expires 2031-07-24)
  • permitted: Planning FW24A/0012: unstarted (live permission, no commencement notice) (expires 2029-04-08)

Who runs it

  • EPA licensee 'South Dublin Routing 4 No. 2 Limited' -> Pure DC (operator SPV; high-confidence entity link from BCMS, CRO, EPA, planning, press)
  • lifecycle: commencement notices name Pure DUB01
  • planning applicant 'South Dublin Routing 4 No. 2 Limited' -> Pure DC (operator SPV; high-confidence entity link from BCMS, CRO, EPA, planning, press)
  • planning applicant 'South Dublin Routing 4 No. 2 Limited' -> Pure DC (operator SPV; high-confidence entity link from BCMS, CRO, EPA, planning, press); lifecycle: applicant South Dublin Routing 4 No.2 Ltd, same company as FW24A/0246E
  • some records attributed by co-location only (no operator in their own source)
Leaflet © OpenStreetMap contributors

Generators and power

EPA licenceStatusRoleMWthPlantPermitted hours
P1210Licensed · Not Commencedprimary-gas196.729 x 21.64 MWth dual-fuel engines in 3 energy centres (gas; 23.0 MWth on HVO/gas oil) + 1 x 1.15 MWth emergency generator; temporary plant of 4 gas + 4 liquid-fuel engines runs DC1 until Q4 2026Continuous (>99% of site power); no grid connection for IT load

What the planning and licence documents say

Three DCs (DC1-3) and three gas energy centres (EC1-3) under EPA application P1210-01 (2026 addendum recommends grant); off-grid, powered by on-site gas engines, with a temporary gas/HVO plant running DC1 until Q4 2026.

SpecValueQuote and source
Import capacity0.5 MVA"The agreed maximum import capacity (MIC) of the utility connection is 500 kVA." EPA P1210-01: Addendum Inspectors Report - P1210-01.pdf, p.6
500 kVA ESB connection for lighting, office and support systems only, not the IT load.
Grid voltage38 kV"Permission is also sought for a 173sqm 10MVA/38kV substation" ACP 501133 inspector report, p.3
Proposed in the DC2/DC3 amalgamation application (2026).
Connection pointproposed 173 m2 10MVA/38kV substation; existing 500 kVA ESB substation"Permission is also sought for a 173sqm 10MVA/38kV substation" ACP 501133 inspector report, p.3
Connection termsnone for IT load (off-grid; no grid connection agreement)"There is no electricity grid connection agreement in place to power the main IT load of the data centres" EPA P1210-01: Addendum Inspectors Report - P1210-01.pdf, p.6
On-site generationdual-fuel gas engines for primary continuous power (3 energy centres) + BESS"The engines will be the main continuous power source to the data centres (>99% of the continuous power supply)" EPA P1210-01: Addendum Inspectors Report - P1210-01.pdf, p.1
Generating units9 units"Each energy centre will have three 21.6 MWth dual fuel engines, making up a total of nine dual fuel engines on site, totalling 194.76 MWth." EPA P1210-01: Addendum Inspectors Report - P1210-01.pdf, p.1
Permanent plant; excludes temporary 4 gas + 4 liquid-fuel engines (to Q4 2026) and a 1.15 MWth emergency generator.
On-site thermal input194.8 MWth"Each energy centre will have three 21.6 MWth dual fuel engines, making up a total of nine dual fuel engines on site, totalling 194.76 MWth." EPA P1210-01: Addendum Inspectors Report - P1210-01.pdf, p.1
On natural gas; c.207.2 MWth on liquid fuel.
Fuelnatural gas (primary); HVO / gas oil (secondary)"will combust natural gas (primary fuel) or gas oil/hydrotreated vegetable oil (HVO) (secondary fuel)" EPA P1210-01: Addendum Inspectors Report - P1210-01.pdf, p.1
Running hourscontinuous on gas; liquid fuel up to 200 h/yr emergency + 52 h/yr testing"hours per annum (for “emergency” operations involving a loss of natural gas) and 52 hours per year for testing" EPA P1210-01: Addendum Inspectors Report - P1210-01.pdf, p.35
Liquid-fuel limit: nine engines for 200 h/yr on loss of gas plus 52 h/yr testing; engines otherwise run continuously on gas.
Water7.2 m3/day (derived)"the total water used per annum figure of 2,632 m3" EPA P1210-01: Addendum Inspectors Report - P1210-01.pdf, p.35
Derived: 2,632 m3/yr / 365 (permanent installation).
Floor area40,635 m2"Total gross floor area of the resultant development revised to c. 40,635sqm." ACP 501133 inspector report, p.7
Whole development as permitted under FW18A/0114; DC2+DC3 later amalgamated into a 22,295 m2 building (2026).
PhasingDC1 built and run on temporary gas/HVO plant; EC1-EC2 then DC2, DC3, EC3"DC1 has been constructed and is currently powered by the temporary energy generation plant in place." EPA P1210-01: Addendum Inspectors Report - P1210-01.pdf, p.4
DatesEC1/EC2 Q3 2026; DC2/DC3 Q1 2028; EC3 Q2 2028; temporary plant removed by Q4 2026"DC2 Not commenced Q3 2026 Q1 2028" EPA P1210-01: Addendum Inspectors Report - P1210-01.pdf, p.5
Heat reuseprovision for waste heat export to a future district heating scheme (no agreement)"The installation has made provision for waste heat recovery and export to a potential future district heating scheme (DHS)." EPA P1210-01: Addendum Inspectors Report - P1210-01.pdf, p.45
RenewablesRD condition: at least 80% renewable/zero-rated within 6 years; biomethane purchase agreements + EACs; 66 MWh/yr PV"with the objective of meeting at least 80% of annual demand with renewable energy and/or zero-rated fuel within six years" EPA P1210-01: Addendum Inspectors Report - P1210-01.pdf, p.46

Every value is quoted from the document and page cited; the quote was checked against that page's text. "Derived" means the reader worked it out from stated figures (shown in the quote). Planning and licence figures are design or permitted values, not measured use; values derived from an EPA annual environmental report (AER), mostly water, are reported use for that year. The note under each quote gives the scope and whether a demand figure is a maximum or an average.

Planning history

ReceivedRefWhatDecisionBuilt?
2026-01-20FW26A/0021E
Construction of a data centre building with all associated site works
GRANT PERMISSIONunstarted, permission live
2024-06-11FW24A/0246E
The application for planning permission consists of modifications to permission Ref. FW17A/0167 (for demolition of existing warehouse and construction of 3 no. data centres and associated works) and p
GRANT PERMISSIONcommenced (no completion certificate on a main building yet)
2024-06-04FW24A/0239E
The application for planning permission consists of modifications to permission Ref. FW17A/0167 (for demolition of existing warehouse and construction of 3 no. data centres and associated works) and p
Invalid Applicationwithdrawn/invalid/undecided
2018-07-31FW18A/0114
Modifications to permission Ref. FW17A/0167 (for demolition of existing warehouse and construction of 3 no. data centres and associated works). The proposed modifications to the permitted development
GRANT PERMISSIONcommenced (no completion certificate on a main building yet)
Appeal 501133 (FW26A/0021E) · other, 2026-07-24
Issues: levy reduced to €2,424,253 (23,053 m2)
Board: Coimisiún amended condition 21 per inspector.
"a 173sqm 10MVA/38kV substation" p.3
"installation of 4 no. gas powered generators and 4 no. bio diesel (HVO) generators" p.8

Sources for this page

osm:way/1125965808 · epa:P1210 · valuation:10034774 · planning:FINGAL/FW18A/0114 · planning:FINGAL/FW24A/0239E · planning:FINGAL/FW24A/0246E · planning:FINGAL/FW26A/0021E · planning:FINGAL/FW24A/0012 · acp:501133

Joined from OpenStreetMap, the planning register, An Coimisiún Pleanála, EPA licences and annual reports, the Tailte Éireann valuation list and Building Control. Data built 2026-10-10.