Council · data centres and power

← All councils

Data centres in Clare

1
Operating campuses
2 known at any stage
—
Average grid draw, 2025
EPA-reporting sites only
€0.2m
Estimated rates a year
0% of national
—
Metered water, 2025
EPA-licensed sites
3
Planning applications
2 granted · 1 refused · 1 appealed

Campuses

Leaflet © OpenStreetMap contributors · Tailte Éireann (CC BY)

Grid headroom in Clare

169 MVA
Demand headroom at HV stations, summed
25 transformer groups · upper bound
14 of 25
HV transformer groups with none
9 green · 2 capped by parent
126 MVA
At 38 kV
6 transformer groups
67%
Of LV substations with none
1,302 substations

Largest HV transformer groups, then MV, by demand headroom

StationConnect atDemand MVAGeneration MW
● Booltiagh T14338 kV56.40
● Booltiagh T14138 kV54.92.9
● Tullabrack38 kV14.40
● Drumline38 kV0.429.7
● Ardnacrusha38 kV035
● Ennis38 kV02.7
● TullabrackMV (10/20 kV)14.40
● EnnisMV (10/20 kV)13.115.1
● BooltiaghMV (10/20 kV)12.60
● KilkeeMV (10/20 kV)1.10

headroomcapped by parentnone · size = demand MVA

ESB Networks' indicative transformer headroom, not a connection offer; it ignores upstream circuits and the transmission system. Station capacity Oct 2025, contracts to Aug–Oct 2025, compiled 12/12/2025. How to read it.

Local TDs asking about data centres

Donna McGettigan · Sinn Féin · Clare11
Violet-Anne Wynne · Sinn Féin · Clare4
Joe Carey · Fine Gael · Clare1
Michael Harty · Independent · Clare1

Constituency-to-council matching is by name and approximate.