Council · data centres and power
Data centres in Cork County
1
Operating campuses
4 known at any stage
—
Average grid draw, 2025
EPA-reporting sites only
—
Estimated rates a year
—
Metered water, 2025
EPA-licensed sites
11
Planning applications
10 granted · 0 refused · 0 appealed
Campuses
| National Space Centre Elfordstown, Midleton | operating | — |
| Little Island, Cork (operator not identified) (1) | under construction | — |
| Little Island, Cork (operator not identified) (2) | permitted | — |
| Ovens, Cork (operator not identified) | lapsed | — |
Open applications
| 21/4777 | Proposed change of use and alterations/extension of an existing pharmaceutical facility building to a data centre. The proposed development will include demolition of an existing storage shed, provision of ancillary plant/services and boundary treatments with connection to existing mains services an | 2021-05-03 |






Leaflet © OpenStreetMap contributors · Tailte Éireann (CC BY)
Grid headroom in Cork County
556 MVA
Demand headroom at HV stations, summed
72 transformer groups · upper bound
30 of 72
HV transformer groups with none
40 green · 2 capped by parent
365 MVA
At 38 kV
14 transformer groups
63%
Of LV substations with none
3,760 substations
Largest HV transformer groups, then MV, by demand headroom
| Station | Connect at | Demand MVA | Generation MW |
|---|---|---|---|
| ● Glenlara T141 | 38 kV | 56.1 | 19.4 |
| ● Boggeragh | 38 kV | 55.6 | 16.8 |
| ● Charleville T141 | 38 kV | 53.9 | 8.8 |
| ● Dunmanway | 38 kV | 43.9 | 8.5 |
| ● Ballylicky | 38 kV | 42.2 | 0 |
| ● Glenlara T142 | 38 kV | 38.7 | 10.8 |
| ● Barnahely | 38 kV | 20.5 | 24.4 |
| ● Mallow | 38 kV | 18.1 | 16.6 |
| ● Cow Cross | MV (10/20 kV) | 19.7 | 12.1 |
| ● Hartnetts Cross | MV (10/20 kV) | 18.8 | 8.2 |
| ● Barnahely | MV (10/20 kV) | 18.2 | 58 |
| ● Coolroe | MV (10/20 kV) | 17.5 | 25.5 |
headroomcapped by parentnone · size = demand MVA
ESB Networks' indicative transformer headroom, not a connection offer; it ignores upstream circuits and the transmission system. Station capacity Oct 2025, contracts to Aug–Oct 2025, compiled 12/12/2025. How to read it.
Local TDs asking about data centres
Constituency-to-council matching is by name and approximate.