1
Operating campuses
1 known at any stage
—
Average grid draw, 2025
EPA-reporting sites only
€0m
Estimated rates a year
0% of national
—
Metered water, 2025
EPA-licensed sites
0
Planning applications
0 granted · 0 refused · 0 appealed
Campuses






Leaflet © OpenStreetMap contributors · Tailte Éireann (CC BY)
Grid headroom in Limerick
56 MVA
Demand headroom at HV stations, summed
25 transformer groups · upper bound
15 of 25
HV transformer groups with none
10 green · 0 capped by parent
13 MVA
At 38 kV
2 transformer groups
58%
Of LV substations with none
1,796 substations
Largest HV transformer groups, then MV, by demand headroom
| Station | Connect at | Demand MVA | Generation MW |
|---|---|---|---|
| ● Rathkeale | 38 kV | 12.7 | 0 |
| ● Limerick | 38 kV | 0 | 79.6 |
| ● Singland | MV (10/20 kV) | 13.8 | 24.2 |
| ● Churchtown T422 | MV (10/20 kV) | 7.5 | 0 |
| ● Ahane | MV (10/20 kV) | 6.8 | 9.7 |
| ● Abbeyfeale T421 | MV (10/20 kV) | 5.8 | 0 |
headroomcapped by parentnone · size = demand MVA
ESB Networks' indicative transformer headroom, not a connection offer; it ignores upstream circuits and the transmission system. Station capacity Oct 2025, contracts to Aug–Oct 2025, compiled 12/12/2025. How to read it.