Council · data centres and power

← All councils

Data centres in Louth

1
Operating campuses
2 known at any stage
—
Average grid draw, 2025
EPA-reporting sites only
€0.2m
Estimated rates a year
0% of national
—
Metered water, 2025
EPA-licensed sites
1
Planning applications
1 granted · 0 refused · 0 appealed

Campuses

Dundalk (operator not identified)operating—
eir Droghedaunder construction—
Leaflet © OpenStreetMap contributors · Tailte Éireann (CC BY)

Grid headroom in Louth

70 MVA
Demand headroom at HV stations, summed
19 transformer groups · upper bound
9 of 19
HV transformer groups with none
10 green · 0 capped by parent
21 MVA
At 38 kV
2 transformer groups
52%
Of LV substations with none
1,352 substations

Largest HV transformer groups, then MV, by demand headroom

StationConnect atDemand MVAGeneration MW
● Dundalk38 kV210
● Drybridge38 kV016.3
● MullagharlinMV (10/20 kV)19.827.1
● Marshes T423MV (10/20 kV)90
● RampartsMV (10/20 kV)5.70
● JenkinstownMV (10/20 kV)4.20

headroomcapped by parentnone · size = demand MVA

ESB Networks' indicative transformer headroom, not a connection offer; it ignores upstream circuits and the transmission system. Station capacity Oct 2025, contracts to Aug–Oct 2025, compiled 12/12/2025. How to read it.

Local TDs asking about data centres

Ged Nash · Labour Party · Louth7
Gerry Adams · Sinn Féin · Louth1

Constituency-to-council matching is by name and approximate.