Data centres in Mayo

0
Operating campuses
1 known at any stage
—
Average grid draw, 2025
EPA-reporting sites only
—
Estimated rates a year
—
Metered water, 2025
EPA-licensed sites
1
Planning applications
1 granted · 0 refused · 1 appealed

Campuses

Leaflet © OpenStreetMap contributors · Tailte Éireann (CC BY)

Grid headroom in Mayo

309 MVA
Demand headroom at HV stations, summed
33 transformer groups · upper bound
8 of 33
HV transformer groups with none
25 green · 0 capped by parent
237 MVA
At 38 kV
8 transformer groups
41%
Of LV substations with none
1,580 substations

Largest HV transformer groups, then MV, by demand headroom

StationConnect atDemand MVAGeneration MW
● Dalton T14138 kV56.512.6
● Glenree38 kV560
● Bellacorick38 kV51.814.6
● Tawnaghmore38 kV26.80.1
● Castlebar38 kV250
● Moy38 kV1320
● Carrowbeg38 kV7.930.1
● Dalton T14238 kV017
● GlenreeMV (10/20 kV)17.72.2
● ArdnareeMV (10/20 kV)9.112
● WestportMV (10/20 kV)8.10
● BellacorickMV (10/20 kV)7.60

headroomcapped by parentnone · size = demand MVA

ESB Networks' indicative transformer headroom, not a connection offer; it ignores upstream circuits and the transmission system. Station capacity Oct 2025, contracts to Aug–Oct 2025, compiled 12/12/2025. How to read it.

Local TDs asking about data centres

Rose Conway-Walsh · Sinn Féin · Mayo2
Alan Dillon · Fine Gael · Mayo1
Lisa Chambers · Fianna Fáil · Mayo1