Data centres in Westmeath

1
Operating campuses
2 known at any stage
—
Average grid draw, 2025
EPA-reporting sites only
—
Estimated rates a year
—
Metered water, 2025
EPA-licensed sites
1
Planning applications
1 granted · 0 refused · 1 appealed

Campuses

Leaflet © OpenStreetMap contributors · Tailte Éireann (CC BY)

Grid headroom in Westmeath

30 MVA
Demand headroom at HV stations, summed
9 transformer groups · upper bound
4 of 9
HV transformer groups with none
4 green · 1 capped by parent
3 MVA
At 38 kV
1 transformer groups
50%
Of LV substations with none
854 substations

Largest HV transformer groups, then MV, by demand headroom

StationConnect atDemand MVAGeneration MW
● Mullingar38 kV3.40
● MullingarMV (10/20 kV)10.924.8
● GarrycastleMV (10/20 kV)7.615.5
● BushfieldMV (10/20 kV)6.512.3
● LoughanallaMV (10/20 kV)1.30

headroomcapped by parentnone · size = demand MVA

ESB Networks' indicative transformer headroom, not a connection offer; it ignores upstream circuits and the transmission system. Station capacity Oct 2025, contracts to Aug–Oct 2025, compiled 12/12/2025. How to read it.

Local TDs asking about data centres

Peadar Tóibín · Sinn Féin · Meath West2
Sorca Clarke · Sinn Féin · Longford-Westmeath2
Willie Penrose · Labour Party · Longford-Westmeath1

Constituency-to-council matching is by name and approximate.