Data centre · Meath · 53.7047, -6.3829

← All data centres

Amazon (AWS) Drogheda

operating Amazon (AWS) Our classification · status

13 MW
Average grid draw, 2025
up to ≈1.5% of the CSO data-centre total (upper bound)
96 MW
Stated maximum demand
planning documents · a ceiling, not use
360 MWth
On-site generation licensed
backup-diesel
2.4 ha
Building footprint mapped
2 buildings · OSM
€0.3m
Estimated rates a year
NAV €1.2m
2021
First completion certificate

Why we say it's operating

  • Valuation list: property 5022891 rated as DATA CENTRE
  • Planning LB191735: completion certificate 2021-05-13
  • Planning 21663: completion certificate 2025-12-19

What's next on this site

  • permitted: EPA P1181: generators licensed, activity not commenced

Who runs it

  • EPA licensee 'Amazon Data Services Ireland Limited' -> Amazon (AWS) (operator; high-confidence entity link from EPA)
  • OSM operator tag 'Amazon Web Services'
  • planning applicant 'CAP Developments LLC' -> Amazon (AWS) (development SPV; high-confidence entity link from BCMS, planning, press); lifecycle: commencement notices name DUB 062 (Amazon naming); inferred
  • planning applicant 'Tunis Properties LLC' -> Amazon (AWS) (development SPV; high-confidence entity link from BCMS, planning, press); lifecycle: commencement notice names Amazon DUB072
  • some records attributed by co-location only (no operator in their own source)
Leaflet © OpenStreetMap contributors

Generators and power

EPA licenceStatusRoleMWthPlantPermitted hours
P1181Licensed · Not Commencedbackup-diesel360.0652 x 6.82 MWth diesel standby + 2 x 2.19 MWth (plus 2 x 0.52 MWth fire pumps); doubled from 180.55 MWth by the 2026 review (P1181-02)100 h/yr per generator (P1181-01); review assessed up to 100 h/yr

What the annual environmental reports say

YearLicenceGrid MW avgOn-site fuel GJFull-load hours
2024P11818.22,3691.8
2025P118112.72,3471.8

* part year. Full-load hours = fuel burned ÷ the whole fleet at full load, a derived figure.

What the planning and licence documents say

ADSIL Drogheda IDA campus: Building A (operating) plus Building B (ABP 310729-21 granted; EPA licence review P1181-02, Dec 2025 inspector's report).

SpecValueQuote and source
Electrical demand96 MW (derived)"Electricity (purchased) (average consumption) 840,960 MWh" EPA P1181-02: Attachment-1-2-Non Technical Summary_24.pdf, p.14
derived: 840,960 MWh/yr / 8,760 h = 96 MW average, Buildings A+B. ABP 310729 cites 144 MW incl. planned phase 3.
Grid voltage110 kV"The power requirements for the Installation are provided via a connection to the 110 kV Gas Insulated Switchgear (GIS) Substation Compound" EPA P1181-02: Attachment-1-2-Non Technical Summary_24.pdf, p.7
Connection pointOldbridge 110 kV GIS substation (on site, ABP 308628-20)"The 110kV Substation (known as Oldbridge) is shown on the site plan" EPA P1181-02: Attachment-1-2-Non Technical Summary_24.pdf, p.7
On-site generationemergency back-up diesel/HVO generators"there will be a total of 54 no. back-up generators at the installation, for use in emergency situations" EPA P1181-02: IR - P1181-02_Final.pdf, p.1
Generating units54 units"Therefore, there will be a total of 54 no. back-up generators at the installation" EPA P1181-02: IR - P1181-02_Final.pdf, p.1
Buildings A+B; plus 4 diesel fire sprinkler pumps (minor).
On-site thermal input360.1 MWth"The combined thermal input (total capacity) from the emergency generators is 360.06 MWth" EPA P1181-02: Attachment-4-4-1-Activity Capacity Calculations.pdf, p.1
Buildings A+B incl. fire pumps, per application. EPA inspector report (Dec 2025, p1) revises unit ratings (26x6.82+1.55 for A; 26x6.79+2.02 for B = 357.43 MWth) with 330.21 MWth simultaneous cap (p5).
Fueldiesel and/or HVO (moving to 100% HVO)"The licensee proposes that the generators will operate using diesel and/or hydrotreated vegetable oil" EPA P1181-02: IR - P1181-02_Final.pdf, p.7
Running hours100 h/yr per generator"each generator must not be operated for more than 100 hours annually" EPA P1181-02: Addendum Inspectors Report - P1181-02_v6_2.pdf, p.6
EPA P1181-02 recommended determination.
Coolingfree (outside air) cooling with evaporative/adiabatic mode"The cooling units operate under 2 modes; Free Cooling and Evaporative Cooling" EPA P1181-02: Attachment-1-2-Non Technical Summary_24.pdf, p.7
Water40.9 m3/day (derived)"Water (Public Supply) 14,918 m3" EPA P1181-02: Attachment-1-2-Non Technical Summary_24.pdf, p.15
derived: 14,918 m3/yr / 365 = 40.9 m3/day (estimated annual, Buildings A+B); design average 1.0 l/s, peak 6 l/s.
Floor area28,573 m2"proposed addition of a new data centre building (28,573 sq. m)" EPA P1181-02: IR - P1181-02_Final.pdf, p.1
Building B only; Building A GFA not stated in the listed documents.
PhasingBuilding A (operating) + Building B extension; indicative phase 3 on landholding"the proposed, permitted and planned phase 3 data centre developments will consume 144MW per year" ACP 310729 inspector report, p.22
RenewablesAmazon CPPAs with Irish wind farms (115 MW Galway, 91 MW Donegal, 23 MW Cork); rooftop PV"These projects are all financed by the applicant via corporate power purchase agreement" ACP 310729 inspector report, p.20
Corporate portfolio, not site-specific.

Every value is quoted from the document and page cited; the quote was checked against that page's text. "Derived" means the reader worked it out from stated figures (shown in the quote). Planning and licence figures are design or permitted values, not measured use; values derived from an EPA annual environmental report (AER), mostly water, are reported use for that year. The note under each quote gives the scope and whether a demand figure is a maximum or an average.

Planning history

ReceivedRefWhatDecisionBuilt?
2021-04-1221663
the proposed development consists of the following: construction of a two storey (with mezzanine levels at both storeys) data storage facility building with a maximum overall height of c. 25 metres, containing data halls, associated electrical and mechanical Plant Rooms, a loading bay, maintenance and storage space, office administration areas, screened plant and solar panels at roof level, all within a building with a total gross floor area (FGA) of c. 28,566 sq.m. The proposed data storage facility building will be located to the north of the data storage facility building previously permitt
CONDITIONALcompleted (completion certificate)
2019-12-19LB191735
alterations to existing road infrastructure within the site and clearance of the site (including removal of existing internal roadways and removal / diversion of services) to make way for the proposed development; Construction of a two storey (with mezzanine levels at both storeys) data storage facility building with a maximum overall height of c. 25 metres, containing data halls, associated electrical and AHU Plant Rooms, a loading bay, maintenance and storage space, office administration areas, screened plant and solar panels at roof level, all within a building with a total gross floor area
CONDITIONALcompleted (completion certificate)
Appeal 310729 (21663) · grant, 2022-04-14 · 48 MW stated
Grid: no EirGrid confirmation of capacity; inspector relied on CRU/21/124 criteria-based connection process
Issues: no grid capacity confirmation · climate / ETS · air quality from generators · protected view · cumulative third data centre
"whilst the total MW output of the generators is not stated" p.28
"A 6 MVA substation and associated 6MVA electricity connection" p.10

Sources for this page

osm:way/1123268889 · osm:way/1524364503 · epa:P1181 · valuation:5022891 · planning:MEATH/LB191735 · planning:MEATH/21663 · acp:310729

Joined from OpenStreetMap, the planning register, An Coimisiún Pleanála, EPA licences and annual reports, the Tailte Éireann valuation list and Building Control. Data built 2026-10-10.