Council · data centres and power

← All councils

Data centres in Meath

2
Operating campuses
3 known at any stage
148 MW
Average grid draw, 2025
19% of the total measured at EPA-licensed sites
€10.2m
Estimated rates a year
14% of national
558 ML
Metered water, 2025
EPA-licensed sites
10
Planning applications
7 granted · 0 refused · 2 appealed

Campuses

Meta Cloneeoperating135 MW
Amazon (AWS) Droghedaoperating12.7 MW
SDC-EN Bracetownproposed—

Open applications

2360219the proposed development will consist of a retention application for a building already in existence on the datacentre campus. The building was previously used as a temporary substation to help power the campus during construction stage. The site are is circa 0.04Ha. The building has since been deco2023-09-20
RA191560the development being applied for consists of the following to be constructed in a minimum of four phases: The construction of 4 number 2 storey data storage buildings with a combined gross floor area of c. 92, 172 sq.m, associated single storey energy centre with a grass floor area of c. 8,906 sq.m2019-12-27
RA180030the developlment will consist of alterations to a previously approved Data Centre Campus application (Meath County Council ref: RA/150605/An Bord Pleanala ref: PL17.245347) comprising the following elements: 1) Alterations to the layout, design, external lighting and siting of the previously consent2018-02-21
Leaflet © OpenStreetMap contributors · Tailte Éireann (CC BY)

Grid headroom in Meath

70 MVA
Demand headroom at HV stations, summed
23 transformer groups · upper bound
11 of 23
HV transformer groups with none
12 green · 0 capped by parent
39 MVA
At 38 kV
2 transformer groups
74%
Of LV substations with none
2,180 substations

Largest HV transformer groups, then MV, by demand headroom

StationConnect atDemand MVAGeneration MW
● Meath Hill38 kV26.40
● Navan38 kV12.830.7
● Kingscourt T423MV (10/20 kV)130
● Kingscourt T41/T42MV (10/20 kV)4.20
● LloydMV (10/20 kV)3.36.3
● OldcastleMV (10/20 kV)2.70

headroomcapped by parentnone · size = demand MVA

ESB Networks' indicative transformer headroom, not a connection offer; it ignores upstream circuits and the transmission system. Station capacity Oct 2025, contracts to Aug–Oct 2025, compiled 12/12/2025. How to read it.

Local TDs asking about data centres

Darren O'Rourke · Sinn Féin · Meath East13
Ged Nash · Labour Party · Louth7
Peadar Tóibín · Sinn Féin · Meath West2
Gerry Adams · Sinn Féin · Louth1

Constituency-to-council matching is by name and approximate.