Council · data centres and power

← All councils

Data centres in Dublin City

13
Operating campuses
13 known at any stage
144 MW
Average grid draw, 2025
19% of the total measured at EPA-licensed sites
€7.4m
Estimated rates a year
10% of national
5 ML
Metered water, 2025
EPA-licensed sites
10
Planning applications
6 granted · 0 refused · 0 appealed

Grid headroom in Dublin City

480 MVA
Demand headroom at HV stations, summed
55 transformer groups · upper bound
22 of 55
HV transformer groups with none
33 green · 0 capped by parent
102 MVA
At 38 kV
6 transformer groups
41%
Of LV substations with none
2,816 substations

Largest HV transformer groups, then MV, by demand headroom

StationConnect atDemand MVAGeneration MW
● Inchicore T2102/T2104110 kV113315.1
● Poolbeg110 kV57.1281.1
● Francis Street FranT141/RingT14438 kV36.887.6
● Milltown (Dr) MiltT142/InciT14338 kV29.565.5
● Milltown (Dr) RingT141/MiltT14138 kV21.389.8
● Francis Street InciT141/FranT14238 kV14.781.5
● Grange (Dr)38 kV033.8
● Inchicore38 kV083.7
● Bedford RowMV (10/20 kV)28.462.8
● Heuston SquareMV (10/20 kV)20.827.9
● RingsendMV (10/20 kV)17.829.4
● North QuaysMV (10/20 kV)14.362.7

headroomcapped by parentnone · size = demand MVA

ESB Networks' indicative transformer headroom, not a connection offer; it ignores upstream circuits and the transmission system. Station capacity Oct 2025, contracts to Aug–Oct 2025, compiled 12/12/2025. How to read it.

Local TDs asking about data centres

Bríd Smith · People Before Profit-Solidarity · Dublin South-Central17
Richard Bruton · Fine Gael · Dublin Bay North6
Mary Lou McDonald · Sinn Féin · Dublin Central5
Barry Heneghan · Independent · Dublin Bay North4
James Geoghegan · Fine Gael · Dublin Bay South3
Jim O'Callaghan · Fianna Fáil · Dublin Bay South3
Rory Hearne · Social Democrats · Dublin North-West3
Ivana Bacik · Labour Party · Dublin Bay South2

Constituency-to-council matching is by name and approximate.

In the council chamber