Data-centre water in Ireland: where the '999 million litres' comes from

Licensed Irish data centres used about 1.05 billion litres of public water in 2025, roughly 0.17% of public supply. The widely quoted "999 million litres" is a sum of EPA annual environmental reports, and two sites, Meta Clonee and Equinix Blanchardstown, used 91% of it (EPA AERs, Oct 2026).

By StackPath · published 3 October 2026 · updated 3 October 2026 · how we know · corrections

How much water do data centres use in Ireland?

YearLitresShare of public supplyBasis
~2021810 million0.13%Uisce Éireann public supply to all known data centres (Government Statement on the Role of Data Centres, 2022)
2023217 million0.036%Sum of EPA AER public-supply water, 14 licensed data-centre installations (13 part-year)
2024752 million0.124%Sum of EPA AER public-supply water, 15 licensed data-centre installations (1 part-year)
20251,048 million0.172%Sum of EPA AER public-supply water, 16 licensed data-centre installations
2024752 million—Sum of EPA AER public-supply water, 48 data centres (The Journal's analysis)
2025999 million—Sum of EPA AER public-supply water, 48 data centres (The Journal's analysis)
Annualised1,745 million0.29%Uisce Éireann: 57 data centres on the public network, 4.78 ML/day x 365 (averaging period not stated)

A Dáil written answer in July 2026, citing Uisce Éireann, put data centres at "less than 0.3%" of public supply. Use roughly doubles in hot weather: 1-3 ML/day in Jan-Apr 2026 against 4-6 ML/day in May-Jul 2026, about 0.6–0.9% of the Dublin area's supply at the peak.

Where does the "999 million litres" figure come from?

The Journal Investigates reported 999 million litres for 2025 in July 2026. That was a valuable piece of work, and it is often repeated as if it were a meter reading.

It is not. Adding up the public-supply water rows of the EPA annual environmental reports reproduces it: 752,109 cubic metres for 2024 exactly, and 999,196 cubic metres for 2025 once K2 Strategic's report is left out. With K2 included our total is 1,048 million litres.

So the number is self-reported by licensed sites, which are the big ones. Uisce Éireann's own figure for its 57 connected data-centre sites, 4.78 million litres a day, would come to about 1.7 billion litres over a year.

Which data centres use the most water?

SiteEPA licenceLitres, 2025Litres per MWh of grid power
Runways Information Services Limited (Meta)P1192557 million471
Equinix Hyperscale 1 (DB5) LimitedP1168398 million2,453
The other 14 reporting sites—93 millionmedian 12.9

Two sites use 91% of the measured total. Per unit of electricity, Meta's Clonee campus uses about 471 litres per MWh and Equinix's Blanchardstown site about 2,453. The median for everyone else is 12.9.

Our reading. This is a cooling-design story, not a sector story. Most Irish sites use outside air and barely touch the mains. Two use evaporative cooling heavily. Meta's and Equinix's reasons are not public; it is a fair question to ask them.

Figure 1

Two sites use most of the data-centre water

One Meta site and one Equinix site used 91.1% of licensed data centres' public water in 2025; most other sites use a few litres per MWh.

Where data-centre water goes2025: Runways Information Services (Meta) 556.5 million litres, Equinix Hyperscale 1 (DB5) 398.1 million litres, 14 other licensed sites 93.1 million litres. Litres per MWh: Meta 470.6, Equinix 2,453.3, 14 other sites 12.9 (others range 1–315.2).A · PUBLIC-SUPPLY WATER, 2025, LICENSED SITESRunways Information Services (Meta): 556.5 million litres (53.1%)Meta · 53%Equinix Hyperscale 1 (DB5): 398.1 million litres (38.0%)Equinix · 38%14 other licensed sites: 93.1 million litres (8.9%)14 other sites · 9% ↓Two sites used 91.1% of the 1,048 million litres; the other 14 together used 93 million.B · LITRES PER MWH OF ELECTRICITY (LOG SCALE)1101001,00010,00014 other sites: median 12.9 L/MWh14 other sites median 12.9Meta: 471 L/MWhMeta 471Equinix: 2,453 L/MWhEquinix 2,453Power stations 6,000, modelled
Where data-centre water goes2025: Runways Information Services (Meta) 556.5 million litres, Equinix Hyperscale 1 (DB5) 398.1 million litres, 14 other licensed sites 93.1 million litres. Litres per MWh: Meta 470.6, Equinix 2,453.3, 14 other sites 12.9 (others range 1–315.2).A · PUBLIC-SUPPLY WATER, 2025, LICENSED SITESRunways Information Services (Meta): 556.5 million litres (53.1%)Equinix Hyperscale 1 (DB5): 398.1 million litres (38.0%)14 other licensed sites: 93.1 million litres (8.9%)Meta: 53% · 557 MLEquinix: 38% · 398 ML14 other sites: 9% · 93 MLB · LITRES PER MWH OF ELECTRICITY (LOG SCALE)1101001,00010,00014 other sites: median 12.9 L/MWh14 other sites: median 12.9Meta: 471 L/MWhMeta: 471Equinix: 2,453 L/MWhEquinix: 2,453power stations (model): 6,000

Panel A splits the 1,048 million litres of public-supply water that EPA-licensed data centres reported for 2025 by site. Panel B divides each site's water by the electricity it drew, on a log scale, so each step is ten times the last: the median for the other 14 sites is 12.9 litres per MWh, while Equinix's site used 2,453. The reports do not say what the water is used for; a spread this wide is consistent with different cooling designs (our reading, not stated in the reports). The dashed line is the 6,000 litres per MWh a research paper assigns to generating Irish electricity, which happens at power stations, not data centres.

Sources: EPA annual environmental reports, Table 5 'Water used', 3 Oct 2026 · Fearon, Bresnihan & Brodie, 'How we all pay for Big Tech', MUSSI Working Paper 31, Maynooth University, Sept 2026

Is it a lot?

About 1.05 billion litres is roughly 419 Olympic pools a year, or the daily water of about 21,581 people at 133 litres a day. Nationally, that is small. Six pharmaceutical plants used over 4 billion litres across 2024–25, and Aughinish Alumina over 10 billion (The Journal, from EPA reports).

Locally and seasonally, it is less small. Both heavy users are in the greater Dublin area, where water demand hit a record in May 2026, and data-centre use peaks in hot weather, when supply is tightest.

Figure 2

Data-centre water use, on one scale

Licensed data centres drew about 2.9 million litres a day of public water in 2025, about 0.17% of the 1,700 million Uisce Éireann treats daily; the much bigger "46 billion litres" figure is water used to generate their electricity, not water they draw.

Data-centre water use on one scaleAll public water treated: 1,700.0 million litres a day; Greater Dublin Area: 640.0 million litres a day; Water to make their electricity: 125.9 million litres a day; Data centres in summer 2026: 6.0 million litres a day; Data centres on the public network: 4.8 million litres a day; Licensed data centres, 2025: 2.9 million litres a day. 2.9 ML a day is the median daily use of about 10,997 households.MILLION LITRES A DAY · AREA = VOLUMEAll public water treated: 1,700.0 ML/dayGreater Dublin Area: 640.0 ML/dayWater to make their electricity: 125.9 ML/dayData centres in summer 2026: 6.0 ML/dayData centres on the public network: 4.8 ML/dayLicensed data centres, 2025: 2.9 ML/day1,700 ML · All public water treatedUisce Éireann, 2025640 ML · Greater Dublin Areaaverage day, 2026126 ML · Water to make their electricitymodelled, off-site, mostly at power stations6 ML · Data centres in summer 20264–6 ML/day, 57 sites (as reported)4.8 ML · Data centres on the public networkUisce Éireann, 57 sites, annualised2.9 ML · Licensed data centres, 2025metered, 16 sites, EPA reports2.9 ML a day ≈ 10,997 homes' median useat 261 L per household a day; 0.6% of Ireland's 1.84m households
Data-centre water use on one scaleAll public water treated: 1,700.0 million litres a day; Greater Dublin Area: 640.0 million litres a day; Water to make their electricity: 125.9 million litres a day; Data centres in summer 2026: 6.0 million litres a day; Data centres on the public network: 4.8 million litres a day; Licensed data centres, 2025: 2.9 million litres a day. 2.9 ML a day is the median daily use of about 10,997 households.MILLION LITRES A DAY · AREA = VOLUMEAll public water treated: 1,700.0 ML/dayGreater Dublin Area: 640.0 ML/dayWater to make their electricity: 125.9 ML/dayData centres in summer 2026: 6.0 ML/dayData centres on the public network: 4.8 ML/dayLicensed data centres, 2025: 2.9 ML/day1,700 ML · All public water treatedUisce Éireann, 2025640 ML · Greater Dublin Areaaverage day, 2026126 ML · Water to make their electricitymodelled, off-site, mostly at power stations6 ML · Data centres in summer 20264–6 ML/day, 57 sites (as reported)4.8 ML · Data centres on the public networkUisce Éireann, 57 sites, annualised2.9 ML · Licensed data centres, 2025metered, 16 sites, EPA reports2.9 ML a day ≈ 10,997 homes' median useat 261 L per household a day; 0.6% of Ireland's 1.84m households

Each square's area is proportional to litres per day, so the red square (data centres' metered public-supply water, 1.05 billion litres in 2025 from 16 EPA-licensed sites) can be compared directly with Dublin's and the country's supply. Uisce Éireann's own figure for the 57 data centres on its network, and reported summer peaks, are higher but on the same small scale. The dashed square is a modelled footprint: data centres' electricity multiplied by 6 litres per kWh used at power stations, which is a different quantity from water piped to the sites. National totals hide local pressure: most sites are in the Greater Dublin Area.

EstimateDaily figures are annual totals ÷ 365; household equivalents use the CSO 2022 median household use. The 57-site and summer figures were released to a TD and reported by The Journal; no primary document is public.

Sources: EPA annual environmental reports (Table 5, water used), 3 Oct 2026 · Uisce Éireann press release on 2024 annual report, 30 Jun 2025 · Irish Times (citing Uisce Éireann), 29 May 2026; UE press release 10 Jul 2026 (693 ML record), 29 May 2026 · The Journal, 24 Aug 2026, 24 Aug 2026 · Fearon, Bresnihan & Brodie, 'How we all pay for Big Tech', MUSSI Working Paper 31, Maynooth University, Sept 2026 · CSO, Domestic Metered Public Water Consumption 2022 - Key Findings, 20 Nov 2023

What is the "46 billion litres"?

A Maynooth working paper estimated a 46 billion litre "water footprint". That counts water used to generate the electricity, at 6 litres per kWh, and applies it to 9.4 TWh, an EirGrid forecast, rather than the CSO's metered 7.7 TWh. It measures something different. Never add it to direct use.

Questions people ask

Do data centres in Ireland use a lot of water?
Nationally, no: about 0.17% of public supply in 2025 (EPA AERs). Two sites account for 91%, and use doubles in hot summers.
How much water does the Clonee data centre use?
Meta's Clonee campus reported 557 million litres of public water in 2025 (EPA AER, licence P1192).
Do data centres in Ireland pay for water?
Uisce Éireann bills non-domestic customers for water (unchecked: we have not yet compiled its tariffs or what data centres pay).

How we know

  • We read the public-supply water row from each licensed data centre's EPA annual environmental report and added them up; litres per MWh divide each site's water by its grid electricity in the same report.
  • Comparisons use Uisce Éireann's treated-water volume (1.7 billion litres a day, 2024) and a 2.5 million litre Olympic pool.

Sources

Numbers on this page are read from our data build of 10 October 2026 and update when it changes. Text marked Our reading is our analysis, not a sourced fact. Found a mistake? See corrections; method notes are on methodology.