Data centre · Meath · 53.4186, -6.4368

← All data centres

Meta Clonee

operating Meta Our classification · status

135 MW
Average grid draw, 2025
up to ≈15.4% of the CSO data-centre total (upper bound)
180 MW
Stated maximum demand
planning documents · a ceiling, not use
743 MWth
On-site generation licensed
backup-diesel
14.9 ha
Building footprint mapped
5 buildings · OSM
€9.9m
Estimated rates a year
NAV €46.6m
2019
First completion certificate

Why we say it's operating

  • EPA P1192: on-site generators licensed and in use (Licensable Activity Commenced)
  • Valuation list: property 5015330 rated as DATA CENTRE
  • Valuation list: property 5026249 rated as DATA CENTRE
  • Valuation list: property 5021061 rated as DATA CENTRE
  • Planning RA180671: completion certificate 2020-10-13

What's next on this site

  • under construction: Planning RA180048: commencement notice 2018-08-20, no completion certificate
  • permitted: Planning 23836: unstarted, permission live
  • permitted: Planning 2460041: unstarted, permission live

Who runs it

  • EPA licensee 'Runways Information Services Limited (Meta)'
  • OSM operator tag 'Meta'
  • planning applicant 'Runways Information Services Limited' -> Meta (operator SPV; high-confidence entity link from BCMS, CRO, EPA, planning); lifecycle: Clonee campus
  • planning applicant 'Runways Information Services Limited' -> Meta (operator SPV; high-confidence entity link from BCMS, CRO, EPA, planning); lifecycle: Clonee campus (RA150605)
  • some records attributed by co-location only (no operator in their own source)
Leaflet © OpenStreetMap contributors

Generators and power

EPA licenceStatusRoleMWthPlantPermitted hours
P1192Licensed · Licensable Activity Commencedbackup-diesel743.490 x 8.26 MWth diesel generators (18 per building, 5 buildings)200 h/yr; <=660.8 MWth simultaneously

What the annual environmental reports say

YearLicenceGrid MW avgOn-site fuel GJFull-load hours
2023*P119227.31,3300.5
2024P1192122.94,1641.6
2025P11921359,8073.7

* part year. Full-load hours = fuel burned ÷ the whole fleet at full load, a derived figure.

What the planning and licence documents say

Whole Clonee campus (CLN1-3 and CLN5-6) under EPA licence P1192-01; demand and 220kV grid figures from the 2018 SID substation case (ABP-301923-18); water from the 2025 AER.

SpecValueQuote and source
Electrical demand180 MW"the overall data centre campus would have a maximum energy demand of 180 MW" ACP 301923 inspector report, p.63
Campus maximum demand as stated in 2018; the CLN5/6 expansion alone was 72 MW.
Grid voltage220 kV"construction of a new 220kV substation compound within the proposed data centre site" ACP 301923 inspector report, p.5
Connection pointPortan 220kV loop-in substation (PL17.VA0018) plus new 220kV substation with 220/20kV transformer station (ABP-301923-18)"Power to the data centre is currently provided by a loop in connection and sub-station from the 220kV overhead line" ACP 301923 inspector report, p.7
On-site generationbackup diesel generators (now run on HVO)"Data centre with 90 diesel generators to provide power in the event of a loss or reduction in electricity supply from the grid." EPA P1192-01: Inspector's Report, p.1
Generating units90 units"combined thermal input from the 90 no. 8.26 MWth generators is 743.4 MWth" EPA P1192-01: Inspector's Report, p.3
18 per building across 5 buildings.
On-site thermal input743.4 MWth"combined thermal input from the 90 no. 8.26 MWth generators is 743.4 MWth" EPA P1192-01: Inspector's Report, p.3
FuelHVO (diesel fully replaced in 2025)"No Diesel used in 2025, full transition to HVO." EPA P1192-01: AER 2025 .pdf, p.14
Running hours200 h/yr"The RD limits the operation of diesel generators to 200 hours per year, with no more than 660.8 MWth operating simultaneously" EPA P1192-01: Inspector's Report, p.10
Licence limit (recommended determination, 2023).
Coolingindirect air cooling with adiabatic (evaporative) wet mode in CLN1-3; StatePoint Liquid Cooling in CLN5-6"operates in two different modes, dry cooling and wet cooling mode (adiabatic mode)" EPA P1192-01: Inspector's Report, p.11
Indirect Air Cooling units in CLN1-3, StatePoint Liquid Cooling in CLN5-6 (same page). The technical amendment memo (2025) calls it an evaporative cooling system.
Water1,525 m3/day (derived)"Public Supply 556,513 2.6% decrease" EPA P1192-01: AER 2025 .pdf, p.16
Derived: 556,513 m3 public supply in 2025 / 365.
Floor area57,400 m2"Construction of two single-storey data centre buildings with a gross floor area (GFA) of circa 57,400m2" MeathCC ePlan register entry RA180671 (development description), p.1
Only the CLN5/CLN6 expansion (RA/180671); excludes CLN1-3.
Data halls5 halls (derived)"consisting of five data storage installations (Buildings CLN1, CLN2, CLN3, CLN5, and CLN6). Each data storage installation consists of a data hall" EPA P1192-01: Inspector Report - Licence Amendment.pdf, p.1
Derived: one data hall per building x 5.
Phasing5 buildings built: CLN1-3 (RA/150605) and CLN5-6 (RA/180671)"consists of five data centre buildings (CLN 1, 2, 3, 5 & 6), each housing 18 emergency generators" EPA P1192-01: AER 2025 .pdf, p.9
Heat reusedesigned for possible future district heating connection (no scheme)"heating system (which the EIAR states would facilitate possible future connection to a district heating system)" EPA P1192-01: Inspector's Report, p.26
Renewables100% renewable electricity via CPPA and other structures"maintains 100% renewable electricity supply through CPPA and other structures" EPA P1192-01: AER 2025 .pdf, p.15

Every value is quoted from the document and page cited; the quote was checked against that page's text. "Derived" means the reader worked it out from stated figures (shown in the quote). Planning and licence figures are design or permitted values, not measured use; values derived from an EPA annual environmental report (AER), mostly water, are reported use for that year. The note under each quote gives the scope and whether a demand figure is a maximum or an average.

Planning history

ReceivedRefWhatDecisionBuilt?
2024-01-222460041
Runways Information Services Limited, intend to apply for Planning Permission for demolition works at three separate disused residential properties and associated former agricultural outbuildings located in the townlands of Portan and Gunnocks, Clonee, Co. Meath, and Retention of the 3-no. existing disused outbuildings at the rear of 4 Portan and change of use to ancillary storage facilities for grounds maintenance materials and apparatus associated with the applicants adjacent Data Centre Campus. The proposed works will consist of the demolition of disused residential properties and associate
CONDITIONALunstarted, permission live
2023-08-2523836
the proposed development will consist of a retention application for a building already in existence on the datacentre campus. The building was previously used as temporary substation to help power the campus during construction stage. The site area is circa 0.04 Ha. The building has since been decommissioned and the applicant is applying for retention permission to retain the building for storage of landscaping materials and maintenance equipment. The building is two tiered with different heights. The building measures approximately 12.5 metres in length and has a height of 2.9 metres on the
CONDITIONALunstarted, permission live
2023-08-162360219
the proposed development will consist of a retention application for a building already in existence on the datacentre campus. The building was previously used as a temporary substation to help power the campus during construction stage. The site are is circa 0.04Ha. The building has since been decommissioned and the applicant is applying for retention permission to retain the building for storage of landscaping materials and maintenance equipment. The building is two tiered with different heights. The building measures approximately 12.5 metres in length and has a height of 2.9 metres on the
N/Awithdrawn/invalid/undecided
2020-02-21RA200214
the proposed development will consist of an amendment to the existing approved Data Centre campus (Meath County Council ref: RA/150605 / An Bord Pleanala ref; PL17.245347) and associated boundary treatments application (Meath County Council ref: RA/180048) comprising the following elements: (a) Addition of grasscrete and 6 no. circa 8m high lighting poles for the provision of circa 54 no. overflow car parking spaces to the north of building CLN 3 for commissioning contractors; (b) Demolition of vacant properties at the following addresses (including removal of all services / utilities and sept
CONDITIONALlapsed without commencement notice
2018-06-21RA180671
the proposed development will consist of an expansion of the existing approved data centre Campus (Meath County Council ref: RA/150605 / An Bord Pleanala ref: PL 17.245347) comprising the following elements (a) Construction of two single-storey data centre buildings with a gross floor area (GFA) of circa 57,400m2; (b) A single storey administration / office building with a GFA of circa 5,710m2 which is physically linked to the proposed data centre buildings; (c) Site infrastructure to include entrance gates and appropriate signage, a security guardhouse of circa 60m2 and associated canopy; (d)
CONDITIONALcompleted (completion certificate)
2018-01-22RA180048
the development will consist of alterations to a previously approved Data Centre Campus application (Meath County Council ref: RA/150605/An Bord Pleanala ref: PL17.245347) comprising the following elements: 1) Alterations to the layout, design, external lighting and siting of the previously consented entrance guardhouse of the Data Centre Campus (granted under reg. ref: RA/150605 and ABP reg. ref: PL17.245347) involving the extension of the guardhouse canopy and adddition of Corten steel to the facade and canopy of the building; 2) Proposed boundary treatment improvements including: 3.0m high
CONDITIONALcommenced (no completion certificate on a main building yet)
2018-01-17FW18A/0008
The development will consist of alterations to a previously approved Data Centre application (Meath County Council ref: RA/150605 / An Bord Pleanála ref: PL17.245347 and Fingal County Council ref: F
GRANT PERMISSIONlapsed without commencement notice
2018-01-17RA180030
the developlment will consist of alterations to a previously approved Data Centre Campus application (Meath County Council ref: RA/150605/An Bord Pleanala ref: PL17.245347) comprising the following elements: 1) Alterations to the layout, design, external lighting and siting of the previously consented entrance guardhouse of the Data Centre Campus (granted under reg. ref: RA/150605 and ABP reg. ref: PL17.245347) involving the extension of the guardhouse canopy and adddition of Corten steel to the facade and canopy of the building; 2) Proposed boundary treatment improvements including: 3.0m high
N/Awithdrawn/invalid/undecided
Appeal 301923 (RA180671) · grant, 2018-12-06 · 72 MW stated
Grid: 220 kV · EirGrid: can be accommodated subject to a modified connection agreement
Issues: campus energy demand (180MW) vs renewables targets · construction traffic · archaeology
"estimated maximum energy demand of 72 MW, whilst the overall data centre campus would have a maximum energy demand of 180 MW" p.63
"subject to a modified connection agreement, the proposed 200kV infrastructure can be accommodated by EirGrid" p.9
Appeal 302393 (RA180671) · no decision recorded

Sources for this page

osm:way/819286957 · osm:way/1187438483 · osm:way/518701317 · osm:way/1187438482 · osm:way/683115027 · epa:P1192 · valuation:5015330 · valuation:5026249 · valuation:5021061 · planning:FINGAL/FW18A/0008 · planning:MEATH/RA180030 · planning:MEATH/RA180048 · planning:MEATH/RA180671 · planning:MEATH/RA200214 · planning:MEATH/2360219 · planning:MEATH/23836 · planning:MEATH/2460041 · acp:301923 · acp:302393

Joined from OpenStreetMap, the planning register, An Coimisiún Pleanála, EPA licences and annual reports, the Tailte Éireann valuation list and Building Control. Data built 2026-10-10.