Council · data centres and power

← All councils

Data centres in Kildare

2
Operating campuses
3 known at any stage
—
Average grid draw, 2025
EPA-reporting sites only
—
Estimated rates a year
—
Metered water, 2025
EPA-licensed sites
4
Planning applications
3 granted · 0 refused · 3 appealed

Campuses

Open applications

2460740for a Data Centre and will comprise of: The demolition of 3 no. dwelling houses, associated garages and farm outbuildings / agricultural buildings (total floor area 1,591m2); The construction of 6 no. two storey data centre buildings, each with loading bays, external plant area including electrical 2024-09-05
Leaflet © OpenStreetMap contributors · Tailte Éireann (CC BY)

Grid headroom in Kildare

17 MVA
Demand headroom at HV stations, summed
19 transformer groups · upper bound
15 of 19
HV transformer groups with none
3 green · 1 capped by parent
0 MVA
At 38 kV
3 transformer groups
74%
Of LV substations with none
2,134 substations

Largest HV transformer groups, then MV, by demand headroom

StationConnect atDemand MVAGeneration MW
● Newbridge38 kV015.3
● Griffinrath38 kV02.6
● Blake38 kV017.3
● MonreadMV (10/20 kV)12.617.5
● DunfirthMV (10/20 kV)3.50
● KilcullenMV (10/20 kV)0.60
● AthyMV (10/20 kV)0.122

headroomcapped by parentnone · size = demand MVA

ESB Networks' indicative transformer headroom, not a connection offer; it ignores upstream circuits and the transmission system. Station capacity Oct 2025, contracts to Aug–Oct 2025, compiled 12/12/2025. How to read it.

Local TDs asking about data centres

Catherine Murphy · Social Democrats · Kildare North6
Aidan Farrelly · Social Democrats · Kildare North5
Réada Cronin · Sinn Féin · Kildare North4
James Lawless · Fianna Fáil · Kildare North3
Joe Neville · Fine Gael · Kildare North1
Naoise Ó Cearúil · Fianna Fáil · Kildare North1
Patricia Ryan · Sinn Féin · Kildare South1
Seán Ó Fearghaíl · Fianna Fáil · Kildare South1

Constituency-to-council matching is by name and approximate.