Data centre · Kildare · 53.3395, -6.4976
Government (OGCIO) Backweston, Celbridge
operating Government (OGCIO) Our classification · status
Not available for this site: measured grid draw (no EPA annual report: only sites with ≥50 MWth of plant file one); mapped footprint; rates (no valuation-list entry matched).
Why we say it's operating
- Planning 19164: completion certificate 2025-05-07
Who runs it
- planning applicant 'Office of the Government Chief Information Officer' -> Government (OGCIO) (operator (state); high-confidence entity link from planning); lifecycle: commencement notice: 'Public Sector Data Centre'






What the planning and licence documents say
Single 5,474m2 government data centre building (ABP-305962-19, first-party condition appeal).
| Spec | Value | Quote and source |
|---|---|---|
| Electrical demand | 3.5 MW | "power input of 3.5 MW and that this will be sourced from the new ESB 110kv sub station located to the east" ACP 305962 inspector report, p.4 |
| Grid voltage | 110 kV | "power input of 3.5 MW and that this will be sourced from the new ESB 110kv sub station located to the east" ACP 305962 inspector report, p.4 |
| Connection point | new ESB 110kV substation at Adamstown | "sourced from the new ESB 110kv sub station located to the east of the site in Adamstown" ACP 305962 inspector report, p.4 |
| On-site generation | backup diesel generators | "The backup generators are proposed to be diesel powered and to be fuelled via tow tanks" ACP 305962 inspector report, p.4 |
| Generating units | 5 units | "plant areas including 5 No. backup generators" ACP 305962 inspector report, p.3 |
| Fuel | diesel | "The backup generators are proposed to be diesel powered and to be fuelled via tow tanks" ACP 305962 inspector report, p.4 |
| Floor area | 5,474 m2 | "The construction of a data centre building of c.5474sq. metres floor area" ACP 305962 inspector report, p.3 plus c.2,826m2 external plant area |
| Dates | granted 30/03/2020; permission expiry 29/03/2025 | "Grant Date: 30/03/2020 Grant Managers Order #: DO25983" KildareCC ePlan register entry 19164 (development description), p.1 |
| Heat reuse | heat to existing campus buildings if feasible | "if the recovery of energy from the development is feasible that it will be used to heat existing buildings on the campus" ACP 305962 inspector report, p.4 |
Every value is quoted from the document and page cited; the quote was checked against that page's text. "Derived" means the reader worked it out from stated figures (shown in the quote). Planning and licence figures are design or permitted values, not measured use; values derived from an EPA annual environmental report (AER), mostly water, are reported use for that year. The note under each quote gives the scope and whether a demand figure is a maximum or an average.
Planning history
| Received | Ref | What | Decision | Built? |
|---|---|---|---|---|
| 2019-02-21 | 19164 | the construction of 1 No. building described as follows: The building is c.5474sqm with an additional c.2826sqm in external plant area and is made up of three distinct parts. The central two storey block has a mono-pitch roof structure, the ridge height of which is c.15.15m and it accommodates the data halls and associated plant and equipment rooms. The front block has a flat roof structure with a parapet and is two storey with a parapet height of c.10.60m and it accommodates the entrance reception, offices, meeting room, associated support areas, tea station, w.c.’s, stores, plant areas inclu | CONDITIONAL | completed (completion certificate) |
Sources for this page
planning:KILDARE/19164 · acp:305962
Joined from OpenStreetMap, the planning register, An Coimisiún Pleanála, EPA licences and annual reports, the Tailte Éireann valuation list and Building Control. Data built 2026-10-10.