The AI race: US vs China vs Europe across the stack, and where Ireland sits

The US leads on compute, chips and frontier models: about three-quarters of GPU-cluster compute (Epoch AI, May 2025), 45% of world data-centre electricity (IEA, 2024) and 19 of 25 models above 10^25 FLOP (Epoch). China has 15% of compute, 5 such models and leads routed usage (59% of OpenRouter tokens). Europe has 15% of data-centre electricity, about 8% of compute and none. Ireland's data centres use 23% of its electricity (CSO, 2025).

Updated 12 October 2026 · data build 2026-10-10 · how we know · corrections

The US leads compute, chips, models and money; China leads usage; Europe trails both

Rows are layers of the AI stack; every cell links to its source and date. Europe = EU-27 plus UK, Norway, Switzerland and Iceland unless the source defines it otherwise. Reported

~75%
US share of GPU-cluster compute
Epoch AI, May 2025
8.3%
Europe's share, our sum of Epoch data
clusters to Jul 2025; estimate
0
European models above 10^25 FLOP
of 25 in Epoch's data
23.2%
Ireland's electricity used by data centres
CSO, 2025
LayerUSChinaEuropeIrelandGulf
Data-centre electricity, share of world (2024)45%
IEA, 2025
25%
IEA, 2025
15%
IEA, 2025
7.7 TWh, 23.2% of national use
CSO, 2025
–
Data-centre electricity growth to 2030 (IEA base case)+240 TWh
IEA, 2025
+175 TWh
IEA, 2025
+45 TWh or more
IEA, 2025
––
GPU-cluster compute, share of worldabout 75% (Epoch) · 79.5% our sum
Epoch, May 2025
15% (Epoch) · 7% our sum
Epoch, May 2025
8.3% (our sum)
Epoch data to Jul 2025
0%: no cluster listed
Epoch data
0.64%
Epoch data
Large AI data centres tracked, current power11,851 MW, 77 sites
Epoch, Oct 2026
731 MW, 4 sites
Epoch, Oct 2026
243 MW, 7 sites
Epoch, Oct 2026
0 sites listed
Epoch, Oct 2026
0 MW, 1 site
Epoch, Oct 2026
AI chips: share of installed AI-chip capacity by designer's home96.4%
Epoch, to Dec 2025
3.6%
Epoch, to Dec 2025
0%: no European designer in the data
Epoch, to Dec 2025
––
Chipmaking: EU share of world chip value chain––11.7% projected for 2030 vs 20% target
ECA, Apr 2025
––
AI-chip startup funding, Jan to mid-Apr 2026$4.7bn
CNBC/Dealroom
–$0.8bn
CNBC/Dealroom
––
Models above 10^25 FLOP (published estimates)19
Epoch, Oct 2026
5
Epoch, Oct 2026
0
Epoch, Oct 2026
0
Epoch, Oct 2026
1 (Saudi Aramco)
Epoch, Oct 2026
Best model on Arena (text, rank)#1 gemini-4-argon-high
Arena, Oct 2026
#16 kimi-k3-max
Arena, Oct 2026
#115 mistral-large-4
Arena, Oct 2026
––
Share of tokens on OpenRouter, 30 days29.2%
OpenRouter, Oct 2026
58.8%
OpenRouter, Oct 2026
0.26%
OpenRouter, Oct 2026
––
Private AI investment$285.9bn (2025)
AI Index 2026
$12.4bn (2025)
AI Index 2026
over €5.3bn raised by AI companies (2025, tech.eu); UK $4.5bn (2024, AI Index)
different methods
––
Frontier-lab funding, total equity$359bn (OpenAI, Anthropic, xAI)
Epoch, Oct 2026
$8.7bn (DeepSeek, Z.ai, MiniMax; understated)
Epoch, Oct 2026
$14.7bn (10 labs)
ours, Oct 2026
no lab HQ listed
ours
–
Hyperscaler / public AI-infrastructure spend$586bn capex, five US hyperscalers, 12 months
SEC EDGAR, Oct 2026
–€10bn public for AI gigafactories, ~€20bn private expected
EuroHPC, Jul 2026
€10m gigafactory commitment (with France)
gov.ie, Jul 2026
–

– means no comparable figure we could source. Ireland is part of Europe's totals.

Download CSV ↓

Source: IEA Energy and AI · Epoch AI, GPU clusters, AI data centres, chip owners, models (CC BY 4.0) · Stanford AI Index · CSO · SEC EDGAR · as of 2026-10-11 · Compiled by StackPath

Shares side by side: Europe has power demand, not compute

Europe's share of data-centre electricity is far larger than its share of AI compute, chips or model usage. Measured

Data-centre electricity, 2024 (IEA) · share of 415 TWh

US45%
China25%
Europe15%

GPU-cluster compute (Epoch data, our sum) · 460 clusters operating to Jul 2025

US79.5%
Europe8.3%
China7%
Gulf0.64%

Large AI data-centre power tracked (Epoch) · 93 sites; the rest are elsewhere (mainly Malaysia)

US85.7%
China5.3%
Europe1.8%

AI-chip capacity by designer's home (Epoch) · cumulative to Dec 2025

US96.4%
China3.6%
Europe0%

Tokens routed on OpenRouter, 30 days · the rest is undisclosed, other or unclassified

US29.2%
China58.8%
Europe0.26%

Source: IEA · Epoch AI, data (CC BY 4.0) · OpenRouter (CC BY 4.0) · as of 2026-10-11 · Compiled by StackPath

Notable AI models per year: the US far ahead, Europe in single digits

Models Epoch AI counts as notable, by the bloc of the developer (a joint model counts for each bloc). Measured

02346709320182019202020212022202320242025
USChinaEurope
Download CSV ↓

Source: Epoch AI, notable models (CC BY 4.0) · as of 2026-10-12 · Stanford AI Index 2025 counted 40 US, 15 Chinese and 3 European notable models in 2024 · Compiled by StackPath

Europe's large AI sites in Epoch's tracker: 243 MW across 7

Sites Epoch tracks by satellite and permits, current power. Not a census. Measured

SiteCountryCurrent MWOwner
Google Waltham CrossUnited Kingdom88Google
Nebius MantsalaFinland75Nebius
CoreWeave NorwayNorway42CoreWeave
Start Campus Sines Data CampusPortugal33Nscale
Nscale KeflavikIceland5Nscale
EcoDataCenter 2Sweden0Mistral AI
Microsoft Narvik NorwayNorway0Nscale

None in Ireland. For comparison, the US total in the same tracker is 11,851 MW.

Download CSV ↓

Source: Epoch AI, AI data centres (CC BY 4.0) · as of 2026-10-11 · Compiled by StackPath

Where Ireland sits. Ireland is a large host of cloud data centres and a heavy user of power for them (23.2% of electricity, 2025), but it has none of the GPU clusters or large AI sites in Epoch's trackers, no frontier lab HQ, and a €10m stake in a French-led gigafactory bid rather than a site of its own. See AI data centres in Ireland and EU AI gigafactories.

Our reading. The race is not close on the layers that decide who trains frontier models: compute, chips and lab funding. Europe's strengths in this table are demand-side (data-centre load and spend through US clouds) and public money (gigafactories), which arrive after the private US build-out. The counter-argument, that sovereignty spending is protectionism with little payoff, is tested on the Europe scorecard; this page only measures position.

Epoch's GPU-cluster data covers clusters operating to mid-2025 and an estimated 10–20% of world GPU-cluster performance; Chinese entries are partly anonymised, so China's share is understated in our sum. Epoch's own published shares (US about 75%, China 15%) are shown alongside. Epoch's AI data-centre database tracks the largest AI sites (mostly in the US) by satellite and permits; it is not a census, and a site missing from it is not proof there is none. Chip-owner figures are Epoch model estimates (median) of cumulative AI-chip capacity in H100-equivalents; owners outside the named hyperscalers and China are pooled as 'Other', so Europe can't be split out. IEA figures are 2024 estimates and 2030 base-case projections; Europe is the IEA's own regional definition. Hyperscaler capex for Chinese companies is not in this dataset; see hyperscaler capex.

Questions people ask

Who is winning the AI race, the US or China?
On the numbers here, the US: about three-quarters of GPU-cluster compute against China's 15% (Epoch AI, May 2025), 19 of the models above 10^25 FLOP in Epoch's data against 5 for China, and $285.9bn of private AI investment in 2025 against $12.4bn (AI Index 2026). Chinese developers lead on tokens routed through OpenRouter (58.8% in the last 30 days).
Where does Europe stand in the AI race?
Behind on compute, chips and models. Europe uses 15% of world data-centre electricity (IEA, 2024) but holds about 8% of tracked GPU-cluster compute, designs none of the AI chips in Epoch's capacity data, and has 0 models above 10^25 FLOP with published estimates.
How much AI compute does Europe have?
About 8.3% of the GPU-cluster compute in Epoch AI's data (clusters operating to mid-2025), led by Germany, Norway, France and Switzerland. Epoch's AI data-centre tracker lists 243 MW of large AI sites in Europe against 11,851 MW in the US.
How much electricity do data centres use in the US, China and Europe?
The IEA estimates data centres used about 415 TWh worldwide in 2024, 1.5% of world electricity: 45% in the US, 25% in China and 15% in Europe. It projects about 945 TWh by 2030.
How does Ireland fit into the AI race?
Ireland hosts many cloud data centres, which used 7.7 TWh or 23.2% of its metered electricity in 2025 (CSO). It has no GPU clusters or large AI sites in Epoch's trackers and no frontier lab HQ, and has committed €10m to a French-led AI gigafactory bid.