Data centre · South Dublin · 53.3167, -6.4440

← All data centres

Vantage Profile Park

under construction Vantage Our classification · status

492 MWth
On-site generation licensed
primary-gas
1.8 ha
Building footprint mapped
2 buildings · OSM
Grid connection. Partial: grid connection agreement for a portion of demand; capacity limited; firm connection conditional on on-site dispatchable generation. "VDC has received and executed a grid connection agreement with EirGrid for a portion of the site’s electricity demand." (EPA P1227-01: Attachment-1-2-Non Technical Summary_25.pdf, p.4)

Not available for this site: measured grid draw (no EPA annual report: only sites with ≥50 MWth of plant file one); rates (no valuation-list entry matched).

Why we say it's under construction

  • Planning SD21A/0241: commencement notice 2023-04-20, no completion certificate
  • Planning SD25A/0102W: commencement notice 2025-09-18, no completion certificate
  • 2 building(s) mapped in OSM but no completion certificate, EPA commencement or valuation entry yet

What's next on this site

  • permitted: Planning SD24A/0162W: commenced (no completion certificate on a main building yet)
  • permitted: Planning SD23A/0291: unstarted (live permission, no commencement notice) (expires 2029-04-07)
  • permitted: Planning SD23A/0035: unstarted (live permission, no commencement notice) (expires 2028-07-25)
  • proposed: EPA P1227: licence applied for

Who runs it

  • EPA licensee 'Vantage Data Centers DUB11 Limited' -> Vantage (operator SPV; high-confidence entity link from EPA)
  • planning applicant
  • planning applicant 'Vantage Data Centers DUB11 Limited' -> Vantage (operator SPV; high-confidence entity link from EPA)
  • some records attributed by co-location only (no operator in their own source)
  • some planning records joined by their planning history (cross-referenced refs, same site) and name no operator themselves
Leaflet © OpenStreetMap contributors

Generators and power

EPA licenceStatusRoleMWthPlantPermitted hours
P1203Compliance Failure/Rejected · primary-gas50811 x 21.4 MWth dual-fuel engines (MFGP, 235 MWth) + 35 HVO backup generators (c. 210 MWth) + temporary generator farm (c. 63 MWth)—
P1227Applied · primary-gas492.1911 x 21.44 MWth dual-fuel engines (MFGP North/South) + 22 + 13 emergency generators (3.84-7.69 MWth) (plus fire pumps)MFGP: continuous power supply while grid capacity is limited; emergency generators not for continuous operation

What the planning and licence documents say

Vantage DUB11/DUB12 campus (3 data halls in 2 buildings, permitted SD21A/0241) with two Multi-Fuel Generation Plants; DUB13 extension (ABP-317446) was refused in 2025; EPA IE application P1203-01 was refused-to-consider in 2025 and re-lodged as P1227-01 (Aug 2025).

SpecValueQuote and source
Grid voltage110 kV"a 110kV gas insulated switchgear (GIS) substation and 110kV transmission lines along with associated and ancillary works by Vantage Data Centres DUB11 Limited" ACP 317446 inspector report, p.36
Kilcarbery substation permitted ABP-312793-22
Connection pointKilcarbery 110kV GIS substation (Vantage, ABP-312793-22)"The permitted substation is known as the Kilcarbery Substation." ACP 317446 inspector report, p.36
Connection termspartial: grid connection agreement for a portion of demand; capacity limited; firm connection conditional on on-site dispatchable generation"VDC has received and executed a grid connection agreement with EirGrid for a portion of the site’s electricity demand." EPA P1227-01: Attachment-1-2-Non Technical Summary_25.pdf, p.4
Transmission Connection Agreement signed 1 July 2022 (ABP-317446 p37); Board not satisfied it covers DUB13
On-site generationdual-fuel gas/HVO engines (Multi-Fuel Generation Plant) supplying the data centres when demand exceeds grid capacity / on EirGrid flex signal; plus diesel/HVO emergency backup generators"The purpose of the Multi-Fuel Generation Plant (MFGP) is to supply power to the on-site data centres in the following scenarios" EPA P1227-01: Attachment-1-2-Non Technical Summary_25.pdf, p.4
Generating units11 units"MFGP North and MFGP South include 11 no. turbocharged reciprocating internal combustion units" EPA P1227-01: Attachment-1-2-Non Technical Summary_25.pdf, p.9
MFGP engines (6 North + 5 South); in addition 35 emergency generators (20+2 DUB11, 13 DUB12)
On-site output96 MW"a Gas Regulator compound and a 96MW multifuel Power Generation unit will be provided on site in two buildings" ACP 317446 inspector report, p.40
Energy Statement also says the MFGP will generate 100MW at 11kV
On-site thermal input235 MWth"In total the energy centre will have a net thermal input of 235 MWth." EPA P1203-01: Letter from Applicant - Attachment-1-2-Non-Technical Summary August2024, p.3
MFGP only; Aug 2025 P1227 table: 11 x 21.44 MWth (gas mode) / 22.85 (liquid); whole installation incl. backup 492.19-507.7 MWth
Fuelnatural gas (dual-fuel engines, HVO/diesel pilot and backup fuel); HVO/diesel for emergency generators"The combustion units are dual-fuel engines and, once the Installation is licenced, will operate primarily on natural gas." EPA P1227-01: Attachment-1-2-Non Technical Summary_25.pdf, p.9
Running hoursemergency generators < 18 h/yr each (testing/maintenance) plus emergencies; MFGP continuous capability required by EirGrid"Each generator will be operational for fewer than 18-hours per annum as part of periodical testing and maintenance, in addition to any emergency operation." EPA P1203-01: Letter from Applicant - Attachment-1-2-Non-Technical Summary August2024, p.3
applies to backup generators
Floor area40,589 m2"which will have a gross floor area of 40,589sq.m consisting of" ACP 317446 inspector report, p.16
permitted DUB11 (24,667 m2) + DUB12 (12,915 m2) under SD21A/0241; refused DUB13 would add 12,893 m2
Data halls3 halls"3 no. data halls, referred to as DUB11.1, DUB11.2 and DUB12" EPA P1227-01: Attachment-1-2-Non Technical Summary_25.pdf, p.4
PhasingTemporary Generator Farm (48 x 1.2 MWe HVO) Oct 2024-Jan 2026 bridging until both MFGPs installed"The 48 TGF generators will be in place between October 2024 and January 2026." EPA P1203-01: Letter from Applicant - Attachment-1-2-Non-Technical Summary August2024, p.6
Datesone MFGP by April 2025, second by January 2026"one of the MFGPs will be installed by April 2025 whilst the second will be in place by January 2026" EPA P1203-01: Letter from Applicant - Attachment-1-2-Non-Technical Summary August2024, p.3
per Aug 2024 NTS; P1227 LCP form gives MFGP North start of operation 2026
Heat reusewaste heat recovery via water-source heat pump for office heating; provisions for heat export"a waste heat recovery system will be provided as part of the heating system for the office areas" ACP 317446 inspector report, p.48
DUB13 Energy Statement
RenewablesPPA engagement via broker (Open Energy Market); rooftop PV; MFGP able to run on HVO"I am satisfied that the correspondence demonstrates that VDC DUB11 has engaged with PPA providers in Ireland generally and specifically as regards the proposed development." ACP 317446 inspector report, p.45

Every value is quoted from the document and page cited; the quote was checked against that page's text. "Derived" means the reader worked it out from stated figures (shown in the quote). Planning and licence figures are design or permitted values, not measured use; values derived from an EPA annual environmental report (AER), mostly water, are reported use for that year. The note under each quote gives the scope and whether a demand figure is a maximum or an average.

Planning history

ReceivedRefWhatDecisionBuilt?
2024-06-24SD24A/0162W
We, Vantage Data Centers DUB11 Ltd. are applying for permission for development at this site on lands to the south of the New Nangor Road (R134), Dublin 22; and on land within the townland of Ballybane within Profile Park, Clondalkin, Dublin 22. The development will consist of an amendment and modification of the permitted Gas Networks Ireland (GNI compound that was granted as part of, and under SDCC Planning Ref. SD21A/0241 that will include: - Replacement of the permitted vehicular access to the GNI compound from within the data centre campus to being directly off Legacy Drive that will incl
Grant Permissioncommenced (no completion certificate on a main building yet)
2023-04-04SD22A/0420
Demolition of structures, construction of a data centre and all associated works. Environmental Impact Assessment Report (EIAR) submitted with application.
Refuse Permissionrefused
2022-03-21SD21A/0241
demolition of house and outbuildings and the construction of two Data Centres and ancillary buildings, plant, and site development works. A revised EAIR was submitted as part of the Additional Information response to the council.
Grant Permissioncommenced (no completion certificate on a main building yet)
Appeal 313787 (SD21A/0241) · withdrawn, 2022-07-04
Appeal 317446 (SD22A/0420) · refuse, 2025-04-04
Grid: 110 kV · campus Transmission Connection Agreement signed 1 Jul 2022 (DUB11/12); Board not satisfied it covers DUB13
Issues: whether campus connection agreement covers new building · multi-fuel plant role · EPA IE licence
Board: Inspector recommended grant; Board refused.
"a 96MW multifuel Power Generation unit will be provided on site" p.40
"in order for the proposed and permitted development to receive a firm grid connection, it must install on-site generation to the requested firm capacity" p.38

Sources for this page

osm:way/1456362248 · osm:way/1456362247 · epa:P1203 · epa:P1227 · planning:SDCC/SD21A/0241 · planning:SDCC/SD22A/0420 · planning:SDCC/SD24A/0162W · planning:SDCC/SD25A/0102W · planning:SDCC/SD23A/0291 · planning:SDCC/SD23A/0035 · planning:SDCC/SD20A/0124 · acp:313787 · acp:317446