Data centre · Fingal · 53.4076, -6.4156
Blanchardstown (operator not identified) (3)
permitted Not identified Our classification · status
Not available for this site: measured grid draw (no EPA annual report: only sites with ≥50 MWth of plant file one); mapped footprint; rates (no valuation-list entry matched).
Why we say it's permitted
- Planning FW21A/0046: unstarted, permission live (expires 2027-12-05)
Who runs it




What the planning and licence documents say
1,890m2 unit; data-centre use omitted by condition, so no energy/water specs exist.
| Spec | Value | Quote and source |
|---|---|---|
| Floor area | 1,890 m2 | "a light industrial warehouse / data centre (1,890sqm, approximately)" ACP 312424 inspector report, p.2 data-centre use omitted by condition 2; permitted as warehouse only |
Every value is quoted from the document and page cited; the quote was checked against that page's text. "Derived" means the reader worked it out from stated figures (shown in the quote). Planning and licence figures are design or permitted values, not measured use; values derived from an EPA annual environmental report (AER), mostly water, are reported use for that year. The note under each quote gives the scope and whether a demand figure is a maximum or an average.
Planning history
| Received | Ref | What | Decision | Built? |
|---|---|---|---|---|
| 2021-11-09 | FW21A/0046 | Light industrial warehouse/data centre containing office space | GRANT PERMISSION | unstarted, permission live |
| 2020-03-25 | FW19A/0076 | The development will consist of a light industrial warehouse/data centre totalling 1800 sq.m, 370 sq.m of which will be office space, the provision for 20 car parking spaces, landscaping and all assoc | REFUSE PERMISSION | refused |
Sources for this page
planning:FINGAL/FW19A/0076 · planning:FINGAL/FW21A/0046 · acp:312424
Joined from OpenStreetMap, the planning register, An Coimisiún Pleanála, EPA licences and annual reports, the Tailte Éireann valuation list and Building Control. Data built 2026-10-10.