Council · data centres and power

← All councils

Data centres in Cork City

1
Operating campuses
1 known at any stage
—
Average grid draw, 2025
EPA-reporting sites only
—
Estimated rates a year
—
Metered water, 2025
EPA-licensed sites
0
Planning applications
0 granted · 0 refused · 0 appealed

Campuses

CIX Cork cityoperating—
Leaflet © OpenStreetMap contributors · Tailte Éireann (CC BY)

Grid headroom in Cork City

18 MVA
Demand headroom at HV stations, summed
15 transformer groups · upper bound
12 of 15
HV transformer groups with none
3 green · 0 capped by parent
0 MVA
At 38 kV
2 transformer groups
68%
Of LV substations with none
1,492 substations

Largest HV transformer groups, then MV, by demand headroom

StationConnect atDemand MVAGeneration MW
● Kilbarry38 kV038.7
● Trabeg38 kV026.4
● Liberty StreetMV (10/20 kV)7.928.4
● TrabegMV (10/20 kV)5.523.5
● MarinaMV (10/20 kV)4.726.5
● Dennehys CrossMV (10/20 kV)022.1

headroomcapped by parentnone · size = demand MVA

ESB Networks' indicative transformer headroom, not a connection offer; it ignores upstream circuits and the transmission system. Station capacity Oct 2025, contracts to Aug–Oct 2025, compiled 12/12/2025. How to read it.

Local TDs asking about data centres

Billy Kelleher · Fianna Fáil · Cork North-Central7
Pádraig O'Sullivan · Fianna Fáil · Cork North-Central4