StackPath Ireland

Try a question

Answers are quoted from the site's own pages, with the section and its sources. Nothing is generated.

Council · data centres and power

← All councils

Data centres in Galway City

1
Operating campuses
1 known at any stage
—
Average grid draw, 2025
EPA-reporting sites only
—
Estimated rates a year
—
Metered water, 2025
EPA-licensed sites
0
Planning applications
0 granted · 0 refused · 0 appealed

Campuses

Leaflet © OpenStreetMap contributors · Tailte Éireann (CC BY)

Grid headroom in Galway City

59 MVA
Demand headroom at HV stations, summed
7 transformer groups · upper bound
4 of 7
HV transformer groups with none
3 green · 0 capped by parent
45 MVA
At 38 kV
2 transformer groups
57%
Of LV substations with none
688 substations

Largest HV transformer groups, then MV, by demand headroom

StationConnect atDemand MVAGeneration MW
● Salthill38 kV44.913.8
● Galway38 kV050.3
● SalthillMV (10/20 kV)1136.8
● Trimms LaneMV (10/20 kV)3.513.3
● MoneenageishaMV (10/20 kV)014.3
● Headford RoadMV (10/20 kV)013.7

headroomcapped by parentnone · size = demand MVA

ESB Networks' indicative transformer headroom, not a connection offer; it ignores upstream circuits and the transmission system. Station capacity Oct 2025, contracts to Aug–Oct 2025, compiled 12/12/2025. How to read it.

Local TDs asking about data centres

Catherine Connolly · Independent · Galway West14
Mairéad Farrell · Sinn Féin · Galway West6
Noel Grealish · Independent · Galway West1

Constituency-to-council matching is by name and approximate.