StackPath Ireland

Try a question

Answers are quoted from the site's own pages, with the section and its sources. Nothing is generated.

Europe · country profile

Data centres and AI in Austria, ranked against Europe and the US

Austria ranks 7th of 28 European countries for highest share of businesses using AI (29.9%, 2025); its weakest is 21st of 27 for cheapest wholesale power (€120/MWh, 2025-10 to 2026-09). Its data centres reported 72 MW of IT capacity to the EU for 2025 (25 of an estimated 47 sites). It hosts 1 EU AI Factory. Sources: Eurostat, Ember, EuroHPC, TOP500, Epoch AI; data as of 2026-10-12.

Updated 12 October 2026 · data build 2026-10-10 · how we know · corrections

Where Austria ranks among 31 European countries

Rank 1 = best on the measure's own terms (cheapest, lowest carbon, highest share, most). Each rank is among the European countries with a figure, so the "of" number differs. Austria is an EU member. Measured

19th
of 26 · Big-user electricity price; 1 = cheapest
€0.134/kWh · H1 2026 · Eurostat nrg_pc_205
21st
of 27 · Wholesale power, last 12 months; 1 = cheapest
€120/MWh · 2025-10 to 2026-09 · Ember European wholesale prices
9th
of 31 · Grid carbon intensity; 1 = lowest carbon
117 g/kWh · 2025 · Ember yearly electricity data
10th
of 31 · Clean power share; 1 = highest share
83.6% · 2025 · Ember yearly electricity data
7th
of 28 · Businesses using AI; 1 = highest share
29.9% · 2025 · Eurostat isoc_eb_ai
14th
of 29 · People using generative AI; 1 = highest share
39.4% · 2025 · Eurostat isoc_ai_iaiu
13th
of 24 · TOP500 supercomputing power; 1 = most
47.8 PF · 2026/06 · TOP500
4th
of 16 · EU AI Factories hosted; 1 = most (hosts only)
1 · 2024-12 to 2025-10 · EuroHPC JU
16th
of 27 · Share of EU server imports; 1 = largest share
0.1% · 2025-08 to 2026-07 · Eurostat Comext DS-045409

No figure for Austria on: Data centres' share of electricity; GPU-cluster compute (Epoch AI).

Download CSV ↓

Source: Eurostat nrg_pc_205 · Ember European wholesale prices (via StackPath eu_power_prices) · Ember yearly electricity data (CC BY 4.0) · Eurostat isoc_eb_ai · Eurostat isoc_ai_iaiu · TOP500, June 2026 list (via eu_compute) · EuroHPC JU (via eu_ai_factories) · Eurostat Comext DS-045409 · EU EED data-centre dashboard (via eu_dc_capacity) · as of 2026-10-12 · Compiled by StackPath

Austria against the EU-27 average and the US

Same measure, same source family, nearest year. A dash means no comparable figure, not zero. Measured

How to read this. The first column is Austria; under it, the gap to the EU-27 (percentage points for shares, a multiple for amounts). Per-person rows divide by World Bank population and are our arithmetic. The US power price is EIA's average for all industrial users, not the 150 GWh+ band Eurostat uses for Europe, so read it as indicative.
MeasureAustriaEU-27USIreland
Big-user electricity price€0.134/kWh H1 20261.2× EU€0.110/kWh H2 2025€0.076/kWh 2025€0.165/kWh H1 2026
Grid carbon intensity117 g/kWh 202545% below EU211 g/kWh 2025384 g/kWh 2025263 g/kWh 2025
Clean power share83.6% 2025+12.6 pts vs EU71% 202543% 202547.7% 2025
Data centres' share of electricityno figure3% 20244.4% 202323.2% 2025
Businesses using AI29.9% 2025+10 pts vs EU19.9% 2025–19.6% 2025
People using generative AI39.4% 2025+6.7 pts vs EU32.7% 2025–44.9% 2025
Electricity use per person8.4 MWh 20251.4× EU6.2 MWh 202513.3 MWh 20256.8 MWh 2025
Supercomputing per million people5.2 PF 2026/0649% below EU10.2 PF 2026/0620.6 PF 2026/061.2 PF 2026/06
GPU compute per million peopleno figure177 H100e 2025-073,660 H100e 2025-07–

Source: Eurostat nrg_pc_205, isoc_eb_ai, isoc_ai_iaiu · Ember · EIA via eu_power_prices · LBNL via US DOE (US data-centre share) · Ember Grids for data centres (Europe share) · TOP500 · Epoch AI GPU clusters · World Bank population · as of 2026-10-12 · Compiled by StackPath

Our reading. Per person, Austria has 25% of the US level of TOP500 supercomputing power. Epoch's database covers only part of the world's AI compute, and private clusters are under-recorded everywhere. Estimate

Power: 84% clean generation, €0.134/kWh for the largest users

Generation mix in 2025 (Ember); big-user prices exclude VAT (Eurostat band IG, 150 GWh a year or more). Measured

Wind11.4%
Solar14.1%
Hydro51.9%
Bioenergy6.3%
Gas11.9%
Other fossil4.5%

Share of generation by source, 2025. Darker bars are fossil. Demand 77.3 TWh; generation 73.2 TWh; net imports 4.1 TWh. Carbon intensity 117 gCO2e/kWh (EU-27: 211; US: 384).

€0.00€0.06€0.11€0.17€0.23H2 '22H1 '23H2 '23H1 '24H2 '24H1 '25H2 '25H1 '26
AustriaEU-27 average

Big-user electricity price, € per kWh excluding VAT, by half-year (band IG). The EU-27 average is published later than country figures.

Wholesale power averaged €120/MWh over 2025-10 to 2026-09 (21st cheapest of 27). Taxes and levies (excluding VAT) were 12.5% of the big-user price in Eurostat's latest year-end comparison.

Source: Ember yearly electricity data (CC BY 4.0) · Eurostat nrg_pc_205 · Ember wholesale prices via eu_power_prices · Compiled by StackPath

Data centres: 72 MW of IT capacity reported to the EU

Electricity share, capacity reported under the EU Energy Efficiency Directive (EED, the EU's data-centre reporting law), grid requests, restrictions and energy rules. Reported

  • Reported to the EU (EED): 72 MW of IT capacity at 25 sites for 2025, of an estimated 47 sites that should report; average PUE (power usage effectiveness: total power ÷ IT power) 1.44. Coverage is partial, so this is a floor.

On top of national rules, 7 EU-level rules apply to data centres in every member state (EED reporting, the rating scheme and heat-reuse rules).

Source: EU EED data-centre dashboard · Compiled by StackPath

Compute: 1 EU AI Factory, 47.8 PF on the TOP500

Public AI Factories (EuroHPC), gigafactory bids, the TOP500 supercomputer list and Epoch AI's database of GPU clusters (in H100-equivalents: compute expressed as a number of Nvidia H100 chips). Measured

  • EuroHPC role: AI Factory host.
  • TOP500 (2026/06): 3 systems, 47.8 PF combined (0.26% of the list); the largest is MUSICA Phase 1 at MUSICA, ranked 75th in the world.
  • GPU clusters (Epoch AI): none recorded for Austria (Epoch's database is partial; absence means none recorded).
AI FactoryCityGPUsStatus
AI:AT (AI Factory Austria)Viennanot statedprocuring

Source: EuroHPC JU via eu_ai_factories · TOP500 June 2026 · Epoch AI (CC BY 4.0) · StackPath eu_compute (announced clusters) · Compiled by StackPath

Chips: €227m of Chips Act aid approved for 1 project

Fabs and pilot lines under the EU Chips Act (aid approved is not production), and AI-chip startups headquartered here. Reported

ProjectCompanyAid €mStatus
Premstätten integrated wafer fabams OSRAM227announced

Source: StackPath eu_chips (Commission decisions, company releases) · StackPath eu_ai_chip_startups · Compiled by StackPath

AI use: 39% of people used generative AI in 2025 (EU: 33%)

Eurostat's surveys of businesses (10+ employees, any AI technology) and of people aged 16–74 (generative AI tools in the last three months), plus AI labs headquartered here. Measured

0%8%16%24%32%2021202320242025
AustriaEU-27

Share of businesses with 10 or more employees using at least one AI technology (Eurostat isoc_eb_ai; survey years only). Austria: 29.9% in 2025, 7th of 28.

Any use: Austria39.4%
Any use: EU-2732.7%
For work: Austria21.2%
For work: EU-2715.4%
Private use: Austria31.6%
Private use: EU-2725.5%
Formal education: Austria14.3%
Formal education: EU-279.3%

Share of people aged 16–74 who used generative AI tools in the three months before the 2025 survey. There is no comparable official US series.

Source: Eurostat isoc_eb_ai · Eurostat isoc_ai_iaiu · StackPath eu_ai_labs (Epoch AI, company releases) · Compiled by StackPath

Servers: 0.1% of the EU's server imports from outside the EU land in Austria

Customs flows (Eurostat Comext), not machines installed: ports of entry such as the Netherlands count goods that move on. Measured

  • Servers (HS 847150) from outside the EU, 2025-08 to 2026-07: €39m, 16th of 27 member states.
  • All compute kit (servers, parts, network gear, chips) from outside the EU, last 12 months: €353m (0.3% of the EU total, rank 15); servers up 6% on the previous 12 months.

Source: Eurostat Comext DS-045409 · StackPath eu_hardware_imports · Compiled by StackPath

What our data does not show for Austria

Gaps, not zeros: a missing row means no public figure we could check, or that the series does not cover this country.

  • No official or estimated figure for data centres' share of electricity.
  • No published data-centre grid-queue figure.
  • No current hyperscaler investment pledge in our tracker.
  • No AI lab or AI-chip startup in our European tables.

Deeper pages and other countries

Each layer has its own page with the full European table.

All 31 country profiles

Our reading. Against Ireland, Austria pays 19% less for big-user power and runs a cleaner grid (117 vs 263 gCO2e/kWh). Where data centres and AI compute go also depends on grid access, land, fibre, tax and customers, which these measures do not capture. Our reading

Questions people ask

How much do large electricity users pay in Austria?
Eurostat's average for users of 150 GWh or more a year in Austria was €0.134/kWh in H1 2026, excluding VAT: 19th cheapest of 26 European countries with a figure. The EU-27 average was €0.110 (H2 2025); US industrial users paid about €0.076 in 2025 (EIA, all industrial users).
How much electricity do data centres use in Austria?
Austria publishes no national total. Its data centres reported 72 MW of IT capacity to the EU's database for 2025 (25 of an estimated 47 sites), a floor rather than a total.
Does Austria host an EU AI Factory?
Yes: AI:AT (AI Factory Austria) (EuroHPC JU selections, Dec 2024 to Oct 2025).
How many people and businesses in Austria use AI?
39.4% of people aged 16–74 used generative AI tools in the three months before the 2025 survey (EU-27: 32.7%). 29.9% of businesses with 10 or more employees used at least one AI technology in 2025 (EU-27: 19.9%). Source: Eurostat.
How does Austria compare with Ireland?
Big-user power: €0.134 vs Ireland's €0.165/kWh; grid carbon: 117 vs 263 gCO2e/kWh; data centres' share of electricity: no figure vs 23.2%; people using generative AI: 39.4% vs 44.9%.