Data centres and AI in Sweden, ranked against Europe and the US

Sweden ranks 2nd of 27 European countries for cheapest wholesale power (€64/MWh, 2025-10 to 2026-09); its weakest is 9th of 16 for most GPU-cluster compute (4,932 H100e, 2025-07). Data centres use about 2.1% of its electricity (Swedish Energy Agency (RISE), 2022, estimate). It hosts 1 EU AI Factory. Sources: Eurostat, Ember, EuroHPC, TOP500, Epoch AI; data as of 2026-10-12.

Updated 12 October 2026 · data build 2026-10-10 · how we know · corrections

Where Sweden ranks among 31 European countries

Rank 1 = best on the measure's own terms (cheapest, lowest carbon, highest share, most). Each rank is among the European countries with a figure, so the "of" number differs. Sweden is an EU member. Measured

6th
of 26 · Big-user electricity price; 1 = cheapest
€0.088/kWh · H1 2026 · Eurostat nrg_pc_205
2nd
of 27 · Wholesale power, last 12 months; 1 = cheapest
€64/MWh · 2025-10 to 2026-09 · Ember European wholesale prices
3rd
of 31 · Grid carbon intensity; 1 = lowest carbon
35 g/kWh · 2025 · Ember yearly electricity data
3rd
of 31 · Clean power share; 1 = highest share
98.8% · 2025 · Ember yearly electricity data
10th
of 15 · Data centres' share of electricity; 1 = highest share (exposure, not success)
2.1% · 2022 · Swedish Energy Agency est.
3rd
of 28 · Businesses using AI; 1 = highest share
35% · 2025 · Eurostat isoc_eb_ai
12th
of 29 · People using generative AI; 1 = highest share
42% · 2025 · Eurostat isoc_ai_iaiu
9th
of 24 · TOP500 supercomputing power; 1 = most
133.8 PF · 2026/06 · TOP500
9th
of 16 · GPU-cluster compute (Epoch AI); 1 = most
4,932 H100e · 2025-07 · Epoch AI GPU clusters est.
4th
of 16 · EU AI Factories hosted; 1 = most (hosts only)
1 · 2024-12 to 2025-10 · EuroHPC JU
7th
of 27 · Share of EU server imports; 1 = largest share
1.8% · 2025-08 to 2026-07 · Eurostat Comext DS-045409
Download CSV ↓

Source: Eurostat nrg_pc_205 · Ember European wholesale prices (via StackPath eu_power_prices) · Ember yearly electricity data (CC BY 4.0) · Swedish Energy Agency (RISE), ER 2023:04 · Eurostat isoc_eb_ai · Eurostat isoc_ai_iaiu · TOP500, June 2026 list (via eu_compute) · Epoch AI GPU clusters (CC BY 4.0, via global_context) · EuroHPC JU (via eu_ai_factories) · Eurostat Comext DS-045409 · EU EED data-centre dashboard (via eu_dc_capacity) · Svenska kraftnät (TSO) · as of 2026-10-12 · Compiled by StackPath

Sweden against the EU-27 average and the US

Same measure, same source family, nearest year. A dash means no comparable figure, not zero. Measured

How to read this. The first column is Sweden; under it, the gap to the EU-27 (percentage points for shares, a multiple for amounts). Per-person rows divide by World Bank population and are our arithmetic. The US power price is EIA's average for all industrial users, not the 150 GWh+ band Eurostat uses for Europe, so read it as indicative.
MeasureSwedenEU-27USIreland
Big-user electricity price€0.088/kWh H1 202620% below EU€0.110/kWh H2 2025€0.076/kWh 2025€0.165/kWh H1 2026
Grid carbon intensity35 g/kWh 202583% below EU211 g/kWh 2025384 g/kWh 2025263 g/kWh 2025
Clean power share98.8% 2025+27.8 pts vs EU71% 202543% 202547.7% 2025
Data centres' share of electricity2.1% 2022−0.9 pts vs EU3% 20244.4% 202323.2% 2025
Businesses using AI35% 2025+15.1 pts vs EU19.9% 2025–19.6% 2025
People using generative AI42% 2025+9.3 pts vs EU32.7% 2025–44.9% 2025
Electricity use per person12.9 MWh 20252.1× EU6.2 MWh 202513.3 MWh 20256.8 MWh 2025
Supercomputing per million people12.6 PF 2026/061.2× EU10.2 PF 2026/0620.6 PF 2026/061.2 PF 2026/06
GPU compute per million people465 H100e 2025-072.6× EU177 H100e 2025-073,660 H100e 2025-07–

Source: Eurostat nrg_pc_205, isoc_eb_ai, isoc_ai_iaiu · Ember · EIA via eu_power_prices · LBNL via US DOE (US data-centre share) · Ember Grids for data centres (Europe share) · TOP500 · Epoch AI GPU clusters · World Bank population · as of 2026-10-12 · Compiled by StackPath

Our reading. Per person, Sweden has 13% of the US level of GPU-cluster compute in Epoch AI's database and 61% of the US level of TOP500 supercomputing power. Epoch's database covers only part of the world's AI compute, and private clusters are under-recorded everywhere. Estimate

Power: 99% clean generation, €0.088/kWh for the largest users

Generation mix in 2025 (Ember); big-user prices exclude VAT (Eurostat band IG, 150 GWh a year or more). Measured

Wind22.8%
Solar2.6%
Hydro40.1%
Nuclear27.4%
Bioenergy5.9%
Gas0.1%
Other fossil1.2%

Share of generation by source, 2025. Darker bars are fossil. Demand 136.5 TWh; generation 170.2 TWh; net exports 33.7 TWh. Carbon intensity 35 gCO2e/kWh (EU-27: 211; US: 384).

€0.00€0.05€0.10€0.16€0.21H2 '22H1 '23H2 '23H1 '24H2 '24H1 '25H2 '25H1 '26
SwedenEU-27 average

Big-user electricity price, € per kWh excluding VAT, by half-year (band IG). The EU-27 average is published later than country figures.

Wholesale power averaged €64/MWh over 2025-10 to 2026-09 (2nd cheapest of 27). Taxes and levies (excluding VAT) were 0.8% of the big-user price in Eurostat's latest year-end comparison.

Source: Ember yearly electricity data (CC BY 4.0) · Eurostat nrg_pc_205 · Ember wholesale prices via eu_power_prices · Compiled by StackPath

Data centres: about 2.1% of Sweden's electricity

Electricity share, capacity reported under the EU Energy Efficiency Directive (EED, the EU's data-centre reporting law), grid requests, restrictions and energy rules. Reported

  • Share of electricity: 2.1% in 2022 (share of demand: midpoint of 2.8-3.2 TWh (RISE for the Swedish Energy Agency, crypto excluded) ÷ Ember 2022 demand 139.8 TWh; our arithmetic (range 2.0-2.3%); Swedish Energy Agency (RISE), ER 2023:04, estimate). Europe as a whole: about 3% (2024, Ember estimate); the US: 4.4% (2023, LBNL estimate).
  • Reported to the EU (EED): 699 MW of IT capacity at 71 sites for 2025, of an estimated 103 sites that should report; average PUE (power usage effectiveness: total power ÷ IT power) 1.23. Coverage is partial, so this is a floor.
  • Grid requests: 7.5 GW requested (all large loads (said in a data-centre context); Svenska kraftnät (TSO)) (as at 2026-06; source).

Restrictions and connection rules (1)

National energy rules for data centres: reporting and incentives only

On top of national rules, 7 EU-level rules apply to data centres in every member state (EED reporting, the rating scheme and heat-reuse rules).

Source: Swedish Energy Agency (RISE), ER 2023:04 · EU EED data-centre dashboard · Svenska kraftnät (TSO) · Compiled by StackPath

Cloud and capital: €3bn pledged by hyperscalers, €0bn with visible building

Hyperscaler pledges (a pledge is not a building), sovereign-cloud offers by jurisdiction, and neocloud (GPU cloud) sites. Reported

CompanyPledgeAnnouncedEvidence
MicrosoftSEK 33.7bn2024-06-03unknown

1 current pledge worth €3bn; €0bn of it is stalled (paused, delayed or cancelled). Horizons and currencies differ.

Neocloud sites in Sweden

CompanySiteMWStatus
CoreWeave (European sites)Sweden (leased/licensed data centre space)–Country listed in 10-K Item 2 Properties; site names/MW not disclosed
Mistral Compute (Mistral AI)Sweden (EcoDataCenter)23 (planned)announced Feb 2026 for 2027
EvrocArlandastad (flagship)18 (planned)target H2 2026; no progress update found
Northern Data / Taiga Cloud (now Quake AI, RUM Group)Boden (Hydro66 Svenska AB)–Subsidiary listed in RUM 10-Q

Neoclouds headquartered here: Evroc.

Source: StackPath eu_pledges (company announcements) · StackPath sovereign_cloud · StackPath eu_neoclouds (filings, company releases) · Compiled by StackPath

Compute: 1 EU AI Factory, 133.8 PF on the TOP500

Public AI Factories (EuroHPC), gigafactory bids, the TOP500 supercomputer list and Epoch AI's database of GPU clusters (in H100-equivalents: compute expressed as a number of Nvidia H100 chips). Measured

  • EuroHPC role: AI Factory host.
  • TOP500 (2026/06): 9 systems, 133.8 PF combined (0.71% of the list); the largest is Arrhenius GPU at EuroHPC/NAISS (National Academic Infrastructure for Super­computing in Sweden), ranked 42nd in the world.
  • GPU clusters (Epoch AI): 4,932 H100e, 0.31% of the world total in Epoch's database (clusters operational by 2025-07). The US holds 1,251,044 H100e in the same data. Estimate
AI FactoryCityGPUsStatus
MIMER (now 'Sweden AI Factory')Linkopingnot statedcontracted

Large AI clusters announced or built

ClusterMWGPUsStatus
Mistral / EcoDataCenter Sweden23–announced
Brookfield Strängnäs AI centre750–announced
evroc Arlandastad1816,000announced

In Epoch AI's frontier data-centre list: EcoDataCenter 2 (Mistral AI).

Source: EuroHPC JU via eu_ai_factories · TOP500 June 2026 · Epoch AI (CC BY 4.0) · StackPath eu_compute (announced clusters) · Compiled by StackPath

AI use: 42% of people used generative AI in 2025 (EU: 33%)

Eurostat's surveys of businesses (10+ employees, any AI technology) and of people aged 16–74 (generative AI tools in the last three months), plus AI labs headquartered here. Measured

0%9%19%28%38%2021202320242025
SwedenEU-27

Share of businesses with 10 or more employees using at least one AI technology (Eurostat isoc_eb_ai; survey years only). Sweden: 35% in 2025, 3rd of 28.

Any use: Sweden42%
Any use: EU-2732.7%
For work: Sweden21%
For work: EU-2715.4%
Private use: Sweden33.7%
Private use: EU-2725.5%
Formal education: Sweden11%
Formal education: EU-279.3%

Share of people aged 16–74 who used generative AI tools in the three months before the 2025 survey. There is no comparable official US series.

Source: Eurostat isoc_eb_ai · Eurostat isoc_ai_iaiu · StackPath eu_ai_labs (Epoch AI, company releases) · Compiled by StackPath

Servers: 1.8% of the EU's server imports from outside the EU land in Sweden

Customs flows (Eurostat Comext), not machines installed: ports of entry such as the Netherlands count goods that move on. Measured

  • Servers (HS 847150) from outside the EU, 2025-08 to 2026-07: €519m, 7th of 27 member states.
  • All compute kit (servers, parts, network gear, chips) from outside the EU, last 12 months: €1.16bn (1.1% of the EU total, rank 10); servers up 435% on the previous 12 months.

Source: Eurostat Comext DS-045409 · StackPath eu_hardware_imports · Compiled by StackPath

What our data does not show for Sweden

Gaps, not zeros: a missing row means no public figure we could check, or that the series does not cover this country.

  • No Chips Act fab or pilot line in our ledger.
  • No AI lab or AI-chip startup in our European tables.

Deeper pages and other countries

Each layer has its own page with the full European table.

All 31 country profiles

Our reading. Against Ireland, Sweden pays 47% less for big-user power and runs a cleaner grid (35 vs 263 gCO2e/kWh). Where data centres and AI compute go also depends on grid access, land, fibre, tax and customers, which these measures do not capture. Our reading

Questions people ask

How much do large electricity users pay in Sweden?
Eurostat's average for users of 150 GWh or more a year in Sweden was €0.088/kWh in H1 2026, excluding VAT: 6th cheapest of 26 European countries with a figure. The EU-27 average was €0.110 (H2 2025); US industrial users paid about €0.076 in 2025 (EIA, all industrial users).
How much electricity do data centres use in Sweden?
About 2.1% in 2022 (Swedish Energy Agency (RISE), ER 2023:04, estimate). Europe as a whole: about 3% (Ember, 2024); the US: 4.4% (LBNL, 2023).
Does Sweden host an EU AI Factory?
Yes: MIMER (now 'Sweden AI Factory') (EuroHPC JU selections, Dec 2024 to Oct 2025).
How many people and businesses in Sweden use AI?
42% of people aged 16–74 used generative AI tools in the three months before the 2025 survey (EU-27: 32.7%). 35% of businesses with 10 or more employees used at least one AI technology in 2025 (EU-27: 19.9%). Source: Eurostat.
How does Sweden compare with Ireland?
Big-user power: €0.088 vs Ireland's €0.165/kWh; grid carbon: 35 vs 263 gCO2e/kWh; data centres' share of electricity: 2.1% vs 23.2%; people using generative AI: 42% vs 44.9%.