Europe · country profile
Data centres and AI in Germany, ranked against Europe and the US
Germany ranks 1st of 16 European countries for most GPU-cluster compute (26,050 H100e, 2025-07); its weakest is 27th of 31 for lowest-carbon grid (334 gCO2e/kWh, 2025). Data centres use about 3.9% of its electricity (Bitkom/Borderstep, 2024, estimate). It hosts 2 EU AI Factories. Sources: Eurostat, Ember, EuroHPC, TOP500, Epoch AI; data as of 2026-10-12.
Updated 12 October 2026 · data build 2026-10-10 · how we know · corrections
Where Germany ranks among 31 European countries
Rank 1 = best on the measure's own terms (cheapest, lowest carbon, highest share, most). Each rank is among the European countries with a figure, so the "of" number differs. Germany is an EU member. Measured
Source: Eurostat nrg_pc_205 · Ember European wholesale prices (via StackPath eu_power_prices) · Ember yearly electricity data (CC BY 4.0) · Bitkom/Borderstep, estimate (BDEW 2024 total) · Eurostat isoc_eb_ai · Eurostat isoc_ai_iaiu · TOP500, June 2026 list (via eu_compute) · Epoch AI GPU clusters (CC BY 4.0, via global_context) · EuroHPC JU (via eu_ai_factories) · Eurostat Comext DS-045409 · EU EED data-centre dashboard (via eu_dc_capacity) · Brandenburg grid operator (unnamed) · as of 2026-10-12 · Compiled by StackPath
Germany against the EU-27 average and the US
Same measure, same source family, nearest year. A dash means no comparable figure, not zero. Measured
| Measure | Germany | EU-27 | US | Ireland |
|---|---|---|---|---|
| Big-user electricity price | €0.127/kWh H1 20261.2× EU | €0.110/kWh H2 2025 | €0.076/kWh 2025 | €0.165/kWh H1 2026 |
| Grid carbon intensity | 334 g/kWh 20251.6× EU | 211 g/kWh 2025 | 384 g/kWh 2025 | 263 g/kWh 2025 |
| Clean power share | 58.5% 2025−12.5 pts vs EU | 71% 2025 | 43% 2025 | 47.7% 2025 |
| Data centres' share of electricity | 3.9% 2024+0.9 pts vs EU | 3% 2024 | 4.4% 2023 | 23.2% 2025 |
| Businesses using AI | 26% 2025+6.1 pts vs EU | 19.9% 2025 | – | 19.6% 2025 |
| People using generative AI | 32.2% 2025−0.5 pts vs EU | 32.7% 2025 | – | 44.9% 2025 |
| Electricity use per person | 6.2 MWh 2025level with EU | 6.2 MWh 2025 | 13.3 MWh 2025 | 6.8 MWh 2025 |
| Supercomputing per million people | 16.8 PF 2026/061.6× EU | 10.2 PF 2026/06 | 20.6 PF 2026/06 | 1.2 PF 2026/06 |
| GPU compute per million people | 312 H100e 2025-071.8× EU | 177 H100e 2025-07 | 3,660 H100e 2025-07 | – |
Source: Eurostat nrg_pc_205, isoc_eb_ai, isoc_ai_iaiu · Ember · EIA via eu_power_prices · LBNL via US DOE (US data-centre share) · Ember Grids for data centres (Europe share) · TOP500 · Epoch AI GPU clusters · World Bank population · as of 2026-10-12 · Compiled by StackPath
Our reading. Per person, Germany has 8.5% of the US level of GPU-cluster compute in Epoch AI's database and 82% of the US level of TOP500 supercomputing power. Epoch's database covers only part of the world's AI compute, and private clusters are under-recorded everywhere. Estimate
Power: 59% clean generation, €0.127/kWh for the largest users
Generation mix in 2025 (Ember); big-user prices exclude VAT (Eurostat band IG, 150 GWh a year or more). Measured
Share of generation by source, 2025. Darker bars are fossil. Demand 516.5 TWh; generation 497 TWh; net imports 19.5 TWh. Carbon intensity 334 gCO2e/kWh (EU-27: 211; US: 384).
Big-user electricity price, € per kWh excluding VAT, by half-year (band IG). The EU-27 average is published later than country figures.
Wholesale power averaged €104/MWh over 2025-10 to 2026-09 (13th cheapest of 27). Taxes and levies (excluding VAT) were 9% of the big-user price in Eurostat's latest year-end comparison.
Source: Ember yearly electricity data (CC BY 4.0) · Eurostat nrg_pc_205 · Ember wholesale prices via eu_power_prices · Compiled by StackPath
Data centres: about 3.9% of Germany's electricity
Electricity share, capacity reported under the EU Energy Efficiency Directive (EED, the EU's data-centre reporting law), grid requests, restrictions and energy rules. Reported
- Share of electricity: 3.9% in 2024 (share of gross national electricity consumption: about 20 TWh (Bitkom/Borderstep model estimate) ÷ 511.9 TWh (BDEW 2024, provisional); our arithmetic; Bitkom/Borderstep, estimate (BDEW 2024 total), estimate). Europe as a whole: about 3% (2024, Ember estimate); the US: 4.4% (2023, LBNL estimate).
- Reported to the EU (EED): 1,508 MW of IT capacity at 454 sites for 2025, of an estimated 456 sites that should report; average PUE (power usage effectiveness: total power ÷ IT power) 1.36. Coverage is partial, so this is a floor.
- Grid requests: 22.0 GW requested (data centres; Brandenburg grid operator (unnamed)) (as at 2025-07; source).
| Operator | Stage | MW | As at |
|---|---|---|---|
| Four TSOs (50Hertz, Amprion, TenneT, TransnetBW) | requested | 220,000 | 2025-12-31 |
| Brandenburg grid operator (unnamed) | requested | 22,000 | 2025-07 |
| Mitnetz Strom (DSO, eastern Germany) | reserved | 16,800 | 2025-12-31 |
| Stromnetz Berlin (DSO) | requested | 2,300 | 2025 |
Grid-queue figures as published; stages (requested, reserved, contracted) are not comparable across operators.
Restrictions and connection rules (5)
- Brandenburg data-centre connection backlog (grid pause, ongoing), from 2022
- Frankfurt data-centre concept (Rechenzentrumskonzept) (zoning, active), from 2022-06-09
- Stromnetz Berlin allocation rounds (Repartierung) (connection rule, active), from 2025
- TSO maturity-based queue for large consumers (Reifegradverfahren) (connection rule, active), from 2026-04
- NRM pro-rata allocation of new grid capacity (connection rule, active), from 2026-10
National energy rules for data centres: efficiency limits
- Renewable electricity 50% (renewable requirement; in force, 2024-01-01) · binding limit
- Customer energy-use disclosure (colocation) (reporting; in force, 2024-01-01)
- Annual information duty and federal data centre register (reporting; in force, 2024-05-15)
- Energy/environmental management system + certification (reporting; in force, 2025-07-01)
- PUE limit for new data centres (hard efficiency limit; in force, 2026-07-01) · binding limit
- Energy reuse share (ERF) for new data centres (heat reuse; in force, 2026-07-01) · binding limit
- Renewable electricity 100% (renewable requirement; adopted, not yet applying, 2027-01-01) · binding limit
- PUE limit for existing data centres (2027) (hard efficiency limit; adopted, not yet applying, 2027-07-01) · binding limit
- PUE limit for existing data centres (2030) (hard efficiency limit; adopted, not yet applying, 2030-07-01) · binding limit
On top of national rules, 7 EU-level rules apply to data centres in every member state (EED reporting, the rating scheme and heat-reuse rules).
Source: Bitkom/Borderstep, estimate (BDEW 2024 total) · EU EED data-centre dashboard · Brandenburg grid operator (unnamed) · Compiled by StackPath
Cloud and capital: €28.1bn pledged by hyperscalers, €8.8bn with visible building
Hyperscaler pledges (a pledge is not a building), sovereign-cloud offers by jurisdiction, and neocloud (GPU cloud) sites. Reported
| Company | Pledge | Announced | Evidence |
|---|---|---|---|
| Amazon (AWS) | €7.8bn | 2024-05-15 | live |
| Amazon (AWS) | €8.8bn | 2024-06-19 | unknown |
| €5.5bn | 2025-11-11 | unknown | |
| Microsoft | €3.2bn | 2024-02-15 | unknown |
| Nvidia-linked | about EUR 1bn | 2025-11-04 | live |
| Oracle | $2bn (part of $3bn DE+NL) | 2025-07-15 | unknown |
6 current pledges worth €28.1bn; €0bn of it is stalled (paused, delayed or cancelled). Horizons and currencies differ.
Sovereign-cloud offers under Germany's jurisdiction (8)
- AWS European Sovereign Cloud · US provider · live
- Delos Cloud (National Partner Cloud, Germany) · European provider · announced
- Oracle EU Sovereign Cloud · US provider · live
- T-Systems Sovereign Cloud powered by Google Cloud · European provider · partly live
- Industrial AI Cloud (Deutsche Telekom + Nvidia) · European provider · live
- T Cloud Public (formerly Open Telekom Cloud) · European provider · live
- IONOS Cloud · European provider · live
- STACKIT · European provider · live
Neocloud sites in Germany
| Company | Site | MW | Status |
|---|---|---|---|
| Polarise | AI Factory Munich | – | Deployed NVIDIA GPUs for Deutsche Telekom Industrial AI Cloud (testimonial) |
| Polarise | Sovereign AI Factory Frankfurt | – | Listed AI factory; status not detailed |
Neoclouds headquartered here: Polarise, Northern Data / Taiga Cloud (now Quake AI, RUM Group).
Source: StackPath eu_pledges (company announcements) · StackPath sovereign_cloud · StackPath eu_neoclouds (filings, company releases) · Compiled by StackPath
Compute: 2 EU AI Factories, 1,402.7 PF on the TOP500
Public AI Factories (EuroHPC), gigafactory bids, the TOP500 supercomputer list and Epoch AI's database of GPU clusters (in H100-equivalents: compute expressed as a number of Nvidia H100 chips). Measured
- EuroHPC role: AI Factory host.
- TOP500 (2026/06): 41 systems, 1,402.7 PF combined (7.49% of the list); the largest is JUPITER Booster at EuroHPC/FZJ, ranked 5th in the world.
- GPU clusters (Epoch AI): 26,050 H100e, 1.66% of the world total in Epoch's database (clusters operational by 2025-07). The US holds 1,251,044 H100e in the same data. Estimate
| AI Factory | City | GPUs | Status |
|---|---|---|---|
| HammerHAI | Stuttgart | 860 | contracted |
| JAIF (JUPITER AI Factory) | Julich | 24,000 | operating |
AI gigafactory bids based here
- Deutsche Telekom and Brookfield (Deutsche Telekom, Brookfield); EoI reported
The EU gigafactory tender closes 3 Dec 2026; bidders are not published, so this lists public announcements only.
Large AI clusters announced or built
| Cluster | MW | GPUs | Status |
|---|---|---|---|
| Deutsche Telekom-NVIDIA Industrial AI Cloud | – | 10,000 | operating |
| Schwarz Digits Datacenter Lübbenau | 200 | 100,000 | under construction |
Source: EuroHPC JU via eu_ai_factories · TOP500 June 2026 · Epoch AI (CC BY 4.0) · StackPath eu_compute (announced clusters) · Compiled by StackPath
Chips: €7,566m of Chips Act aid approved for 11 projects
Fabs and pilot lines under the EU Chips Act (aid approved is not production), and AI-chip startups headquartered here. Reported
| Project | Company | Aid €m | Status |
|---|---|---|---|
| ESMC Dresden fab | ESMC (TSMC 70%, Bosch, Infineon, NXP 10% each) | 5,000 | under construction |
| Smart Power Fab (MEGAFAB-DD) | Infineon | 920 | operating |
| SPRINT capacity expansion | GlobalFoundries | 495 | announced |
| SiCnature SiC epi-wafer factory | Element 3-5 | 353 | announced |
| HNA@SCALE EUV optics | Carl Zeiss | 222 | announced |
| Itzehoe power MOSFET fab | Vishay Siliconix Itzehoe | 214 | announced |
| Fab4Micro open foundry | X-FAB | 128 | announced |
| Quantum-sensor chip metrology | QuantumDiamonds | 76 | announced |
| Overlay and film metrology tool plant | KLA-Tencor MIE | 74 | announced |
| SiC-Pro SiC source material | Zadient Materials Europe | 66 | announced |
| Silicon drift detector plant | KETEK | 18 | announced |
| Fab 29 megafab (Magdeburg) | Intel | – | cancelled |
Largest 12 of 14 by aid.
AI-chip startups
| Company | City | Funding $m | Status |
|---|---|---|---|
| Q.ANT | Stuttgart | 80 | shipping |
| Black Semiconductor | Aachen | 275 | pre-silicon |
| Semron | Dresden | 8 | pre-silicon |
Source: StackPath eu_chips (Commission decisions, company releases) · StackPath eu_ai_chip_startups · Compiled by StackPath
AI use: 32% of people used generative AI in 2025 (EU: 33%)
Eurostat's surveys of businesses (10+ employees, any AI technology) and of people aged 16–74 (generative AI tools in the last three months), plus AI labs headquartered here. Measured
Share of businesses with 10 or more employees using at least one AI technology (Eurostat isoc_eb_ai; survey years only). Germany: 26% in 2025, 9th of 28.
Share of people aged 16–74 who used generative AI tools in the three months before the 2025 survey. There is no comparable official US series.
AI labs headquartered in Germany
| Lab | Type | Funding $bn | Valuation $bn |
|---|---|---|---|
| Helsing | European lab | 3.3 | 18 |
| Black Forest Labs | European lab | 0.45 | 3 |
| DeepL | European lab | – | 2 |
| Aleph Alpha | European lab | 0.15 | – |
Equity funding as tracked by Epoch AI and company releases; US-owned labs in Europe are listed but are not European capital.
Source: Eurostat isoc_eb_ai · Eurostat isoc_ai_iaiu · StackPath eu_ai_labs (Epoch AI, company releases) · Compiled by StackPath
Servers: 8.9% of the EU's server imports from outside the EU land in Germany
Customs flows (Eurostat Comext), not machines installed: ports of entry such as the Netherlands count goods that move on. Measured
- Servers (HS 847150) from outside the EU, 2025-08 to 2026-07: €2.64bn, 3rd of 27 member states.
- All compute kit (servers, parts, network gear, chips) from outside the EU, last 12 months: €8.66bn (8.3% of the EU total, rank 3); servers up 31% on the previous 12 months.
Source: Eurostat Comext DS-045409 · StackPath eu_hardware_imports · Compiled by StackPath
Deeper pages and other countries
Each layer has its own page with the full European table.
- The country scorecard (18 largest markets)
- Electricity prices for data centres
- Data-centre capacity and electricity use
- Data-centre grid queues
- Restrictions and moratoriums
- Data-centre energy rules
- Hyperscaler pledges vs builds
- Sovereign cloud
- Neoclouds
- EU AI Factories and gigafactories
- AI compute in Europe
- Chips Act fabs
- AI chip startups
- European AI labs
- Server imports
- The global AI compute race
- Germany's data-centre register
All 31 country profiles
Our reading. Against Ireland, Germany pays 23% less for big-user power and runs a more carbon-intensive grid (334 vs 263 gCO2e/kWh). Where data centres and AI compute go also depends on grid access, land, fibre, tax and customers, which these measures do not capture. Our reading
Questions people ask
- How much do large electricity users pay in Germany?
- Eurostat's average for users of 150 GWh or more a year in Germany was €0.127/kWh in H1 2026, excluding VAT: 16th cheapest of 26 European countries with a figure. The EU-27 average was €0.110 (H2 2025); US industrial users paid about €0.076 in 2025 (EIA, all industrial users).
- How much electricity do data centres use in Germany?
- About 3.9% in 2024 (Bitkom/Borderstep, estimate (BDEW 2024 total), estimate). Europe as a whole: about 3% (Ember, 2024); the US: 4.4% (LBNL, 2023).
- Does Germany host an EU AI Factory?
- Yes: HammerHAI, JAIF (JUPITER AI Factory) (EuroHPC JU selections, Dec 2024 to Oct 2025).
- How many people and businesses in Germany use AI?
- 32.2% of people aged 16–74 used generative AI tools in the three months before the 2025 survey (EU-27: 32.7%). 26% of businesses with 10 or more employees used at least one AI technology in 2025 (EU-27: 19.9%). Source: Eurostat.
- How does Germany compare with Ireland?
- Big-user power: €0.127 vs Ireland's €0.165/kWh; grid carbon: 334 vs 263 gCO2e/kWh; data centres' share of electricity: 3.9% vs 23.2%; people using generative AI: 32.2% vs 44.9%.